Skip to main content

MT12-029 -- Homestake Mining Company, Lead, SD. - Geology Dept., 1962-05-23

 Item — Box: Misc. Tub 9

Scope and Contents

Main Ledge- Long Projection (West of Dikes) - 1100 level-2450 Level--Incline - (east of dikes) - 1550 Level - 2750 Level -- 6/ 6/62 --N. Incline - Long Projection - East Limb - 2750 Level - 3950 Level --- N. Incline - Long Projection - Cent.Limb - 2750 level - 3950 level --- N. Incline - Long Projection - West Limbs - 2750 level - 4400 level - 11/14/62 ----N. Incline - Long Projections - West limbs - 4400-4850 level -5/28/62 ----S. Incline - Long Projection - Cent. Limb - 3650-5000 level - 11/14/62 ----S. Incline - Long Projection - West limb - 3650-5000 level -- 11/14/62 ----5 Ledge - Long Projection - 1250-3350 level - 11/14/63 ----7 Ledge - Long Projection - A limb-69N.Stope-36N.Stope-11/14/63----7 Ledge - Long Projection - B Limb - 69N. Stope-36N. Stope --11/14/63---- 7 Ledge - Long Projection - A Limb - 38N. Stope - & Ross Pillar--11/14/63----7 Ledge - Long Projection - B. Limb - 38N.Stope & Ross Pillar -- 11/14/63 ---- 9 Ledge - Long Projection - A Limb - 70N.Stope-38N.Stope - 6/6/62 ----9 Ledge - Long Projection - B Limb - 70N Stope - 38N Stope--5/31/62 ----9 Ledge - Long Projection - D Limb - 70N. Stope - 38N. Stope -- 11/14/62 ----9 Ledge - Long Projection - F & G. Limbs - 70N Stope - 38N. Stope -- 11/114/63 ----9 Ledge - Long Projection - H. Limb -- 70N. Stope - 38N. Stope -- 6/6/62 ----9 Ledge - Long Projection - A Limb - 38N Stope & Ross Pillar --11/14/63 ---- 9 Ledge - Long Projection - B. Limb --38N. Stope & Ross Pillar -- 11/14/63 -----9 Ledge - Long Projection - C Limb - 38N. Stope & Ross Pillar -- 11/14/63 ----9 Ledge - Long PRojection - D L:imb - 38N. Stope & Ross Pillar -- 11/14/63 ----9 Ledge - Long Projection - F. Limb - 38N Stope & Ross Pillar --11/14/63 -----9 Ledge - Long Projection - G Limb -- 38N.Stope - Ross Pillar --11/14/63--- 9 Ledge -- Long Projection -- H Limb -- 38N. Stope & Ross Pillar --11/14/63----9 Ledge - Long Projection - A Limb & Ross Pillar --32S.Stope --11/14/63----9 Ledge - Long Projection - B Limb & Ross Pillar - 32S. Stope -- 11/14/63-----9 Ledge - Long Projection -- D Limb & Ross Pillar --32S. Stope -- 11/14/63-----9 Ledge -- Long Projection -- F Limb & Ross Pillar -- 32S. Stope -- 11/14/63-----9 Ledge -- Long Projections-- G Limb & Ross Pillar -- 32S. Stope -- 5/24/64-----9 Ledge -- Long Projection -- H Limb & Ross Pillar -- 32S. Stope --11/13/63

Dates

  • 1962-05-23

Conditions Governing Access

This collection is housed at the Homestake Adams Research and Cultural Center with no restrictions to access. The collection may be utilized during normal operating hours or by appointment.

Extent

From the Collection: Unknown Linear Feet (37 Cabinets, 14 Baskets, 14 Tubs, 2 Boxes, and 7 Canisters)

Language of Materials

From the Collection: English

Creator

Repository Details

Part of the Homestake Adams Research and Cultural Center Repository

Contact:
PO Box 252
150 Sherman St
Deadwood South Dakota 57732
605-722-4800