Box Cabinet D, Tub 2
Container
Contains 181 Results:
D-060-4B -- Grizzly Gulch Tailing Dam - Volume Vs. Time Chart, 1977 - 2000
Item — Box: Cabinet D, Tub 2
Scope and Contents
From the Collection:
The Homestake Mining Company Maps and Blueprints Collection contains a wide variety of maps, drawings, blueprints, and other documents relating to the company's operation. Blueprints consist of machines the Homestake Mining Company used and the buildings that they built. This collection also contains various geological, metallurgical, and engineering maps of the mine.
Dates:
1977 - 2000
D-060-8 -- Covered Masonry Reservoir - Plan In Detail & Cross Section
Item — Box: Cabinet D, Tub 2
Scope and Contents
Sheet 1
Dates:
1877 - 2007
D-060-8 -- Covered Masonry Reservoir - 1/2 Longitudinal Section & 1/4 Plan
Item — Box: Cabinet D, Tub 2
Scope and Contents
Sheet 2
Dates:
1877 - 2007
D-060-8 -- Covered Masonry Reservoir - Ellison Hill Reservoir
Item — Box: Cabinet D, Tub 2
Scope and Contents
Sheet 3
Dates:
1877 - 2007
D-060-8 -- Covered Masonry Reservoir - Concrete Covering Arch & Tunnel Section
Item — Box: Cabinet D, Tub 2
Scope and Contents
Sheet 4
Dates:
1877 - 2007
D-060-8 -- Covered Masonry Reservoir Materials - Details of Beams & Columns
Item — Box: Cabinet D, Tub 2
Scope and Contents
Sheet 5
Dates:
1877 - 2007
D-061-1 -- Gavilan Manganese Plant - Jig & Table Floor Post Layout, 1946-09-19
Item — Box: Cabinet D, Tub 2
Scope and Contents
Sheet 1
Dates:
1946-09-19
D-061-1 -- Gavilan Manganese Plant - Erection Details, 1946-10-01
Item — Box: Cabinet D, Tub 2
Scope and Contents
Sheet 10
Dates:
1946-10-01
D-061-1 -- Gavilan Manganese Plant - Relocated Elevator, 1946-10-02
Item — Box: Cabinet D, Tub 2
Scope and Contents
Sheet 11
Dates:
1946-10-02
D-061-1 -- Gavilan Manganese Plant - Plan of Jig Operating Platform, 1946-09-25
Item — Box: Cabinet D, Tub 2
Scope and Contents
Sheet 1A
Dates:
1946-09-25