Box 4
Contains 113 Results:
D-19-086 -- Spearfish Canyon Lodge Addition to Dining Room, 1960-09-24
Drawn by: Warren
Scale: Shown
Blueprint for the addition to the dinning room at Spearfish Canyon Lodge. The sheet features drawings of the floor plan (scale: 1/2" = 1'-0"), typical section (scale: 1" = 1'-0"), west elevation, and south elevation.
D-19-087 -- Ellison Headframe Jib Crane for Use by Diamond Drill Crew, 1962-08-08
Drawn by: Warren
Scale: 1" = 1'
Blueprint of the Jib Crane for use by Diamond Drill Crew at the Ellison Headframe. The drawing features the side view of a 1 ton jib crane to be fastened to builing column, the flanges, and a stress diagram. The sheet also noted the charge numbers "18901 Lab. // 18903 Mat."
D-19-094-3 -- Kirk Power Plant -- Proposed Final Plan, 1981-07-16
Blueprint for the proposed final plan at the Kirk Power Plant. The sheet features drawings of the plan view (scale: 1/2" = 1'-0"), the elvation view (not to scale), elevation view side (not to scale), sketch final plan, map of Kirk Water System (scale: 1: = 100') and detail B (Hearst II Tank) (scale: 1/8" = 1'-0").
D-19-094-4 -- Kirk Water Service, 1984-02-07
Blueprint of the Kirk Water Service. The sheet features the turbine room, boiler room, centrifuge room, 33KV Sub, a railroad, Whitetail Creek, a warehouse, 14" Hearst Siphon, surge tank, 12 inch lines, 8 inch lines, overflow line, Old Abe siphons, valve house, drains, and a retaining wall. The sheet includes a legend. The sheet has lines in both red (Homestake Mining Company lines) and green (Black Hills Power and Light lines).
D-19-095-1 -- Contour Map -- Yates Mine Office and Yates Dry, 1983-05-06, 1983-05-12
Drawn by: C.N.H.
Scale: 1" = 10'
Contour Map of the Yates Mine Office and Yates Dry. The sheet show Yates Dry, Yares Mine Office, Lawn, Shop Road, and a concrete sidewalk. There is a legend on the sheet and estimated quantities of materials. There is also a note on the sheet that states "Proposed road widening near Yates Dry - DM May 12 '83."
D-19-095-2 -- Contour Map - Yates Mine Office and Yates Dry, 1983-05-06
Drawn by: C.N.H.
Scale: 1" = 10'
Contour Map of the Yates Mine Office and Yates Dry. The sheet show Yates Dry, Yares Mine Office, Lawn, Shop Road, and a concrete sidewalk.
D-19-088 -- Old High (Gusty's Shop) Additional Concrete Floor, 1961-02-06
Drawn by: L.G.W.
Traced by: H.E.M.
Scale: 1/4" = 1'
Blueprint for the additional concrete floor at Old High (Gusty's Shop).
D-19-089 --Sheet 1 -- Reinforced Roof Truss -- Bender Park Carpenter Shop, undated
Drawn by: L.G.W.
Scale: 3/8" = 1'-0"
Blueprint for the reinforced roof trss and the Bender Park Carpenter Shop in Lead, South Dakota.
D-19-089 -- Sheet 2-- Reinforced Roof Truss -- Bender Park Carpenter Shop, undated
Drawn by: L.G.W.
Scale: 3/8" = 1'-0"
Blueprint for the reinforced roof trss and the Bender Park Carpenter Shop in Lead, South Dakota. This sheet features notes on loads.