Box 4
Contains 113 Results:
D-19-058-1 -- Rounding Addition for Trolley Locomotive Motor Generator Set, 1950-07-31
Drawn by H.J.S.
Scale: 3/8" = 1'-0"
Blueprint for the roundhouse addition for trolley locomotive motor generator set. Sheet features drawings of foundation plan, typical section, trolley beam, "A" rods, and "B" rods. There is a note on drawing that states "Note: Floor plan and motor-generator foundationas per later detail."
The drawing was revised on August 17, 1950 by HJS when he added a motor-generator pad.
D-19-042 -- Lead Country Club Table Arrangement for 58 Guests, 1946-09-09
Drawn by: H.J.S.
Traced by: H.J.S.
Scale: 1/4" = 1'-0"
Floor plan of a table arrangement for 58 guest at the Lead Country Club. The floor plan includes the kitchen and five tables.
D-19-043 -- Ellison Heating Plant Ash Disposal Flume, 1946-09-26
Drawn by: G.N.M.
Traced by: G.N.M.
Scale: None
Blueprint for the Ellison Heating Plant Ash Disposal Flum. Drawing shows the boiler foundation, Section "A-", and the typical cross section of Ash Flume.
D-19-044 -- Contour Map Area Above South Mill, 1946-09-30
Traced by: H.J.S.
Scale: 1" = 50'
Drawing features outlines of the South Mill, Refinery, Tank House, Lime Building, Warehouse, Bin, Inclining Hoist, Sub. Station, tanks, and part of Park Avenue in Lead, South Dakota. The countor lines are marked in brown.
D-19-045 -- Access Stairway Ash Handling Crane Kirk Power Station, 1946-10-21
Drawn by: H.J.S.
Traced: H.J.S.
Scale: None
Blueprint for the Access Stairway for the Ash Handling Crane at teh Kirk Power Station. The sheet features drawings of the plan, side views, and view "A-A".
D-19-046 -- Sheet 1 -- Reno Pipe Bridge -- Steel Erection, 1947-07-05
Drawn by: L.G.W.
Traced by: L.G.W.
Approved by: G.N.M.
Scale: 3/4" = 12"
Bluerprint for the Reno Pipe Bridge, steel erection. Sheet features drawings of the plan, side elevation, and end elevation.
D-19-046 -- Sheet 2 -- Reno Pipe Bridge -- Steel, 1947-07-07, 1947-07-10
Drawn by: L.G.W.
Traced by: L.G.W.
Approved by: G.N.M.
Scale = 1" and 3" = 23"
Blueprint of the Renop Pipe Bridge, Steel. The sheet features drawings of Bridge stringers, and bridge beams. On July 10, 1947, L.G.W. made changes in the beams. There is also a not of "account No. 62411."
D-19-047 -- Engineering Department -- Supply Cabinet -- Drafting Room, 1947-09-17
Drawn by: L.G.W.
Traced by: L.G.W.
Scale: 1-1/2" = 12"
Blueprint of a supply cabinent in the drafting room for the Engineering Department. Sheet features drawing of the plan of top, side elevation, front, elevation, and isometric (shown without the doors). The drawing also notes "Charge #7142."
D-19-048 -- Hanna Pump Station -- Kitchen Cabinets -- Ed Dryer Residence, 1947-09-23
Drawn by: L.G.W.
Traced by: L.G.W.
Approved by: G.N.M.
Scale: 1" = 12"
Blueprint for the Kitchen Cabinets for the Ed Dryer Residence at the Hanna Pump Station. The sheet includes drawings of plan of top, front elevation, front elevation (framing details), and section "A-A". Drawing has a note of "Charge # 62312."
D-19-049 -- Turnout Sump Cover Main Spearfish Pipe Line, 1947-09-24
Drawn by: L.G.W.
Traced by: L.G.W.
Approved by: G.N.M.
Scale: 3/4" = 1"
Blueprint of turnour sump cover for the main Spearfish Pipeline. Sheet features drawings of the plan of sump cover, and section elevation. Also noted on the drawing is "Charge #62413" and written in pencil "this cover did not fit see DWg D-19-49A."