Box 4
Contains 113 Results:
D-19-078 -- Slime Plant Platform O.S. Press Fl. Reinforced Concrete Slab, 1958-07-03
Drawn by: Warren
Traced by: L.G.W.
Scale: 1/2" and 1" = 1'-0"
Blueprint for the reinforced concrete slab for the platform O.S. Press FL. at the Slime Plant in Deadwood, South Dakota. The sheet features drawings of thepress floor, rods "A", "B", "C", "D", "E" "F", and "G", section "A-A", and section "B-B".
D-19-079 -- Ross and Yates Hoist Bldgs. Work Platforms Additions, 1958-09-12
Drawn by: Warren
Traced by: L.G.W.
Scale: 1-1/2"
Blueprint for the work platforms additions for the Ross and Yates Hoist Buildings. The sheet features drawings of bracket for extention of cage hoist rope opening work platform and angles to widden existing work platforms.
D-19-037A -- Cyanide No. 3 Extension of Bowl Classifier Floor Edge Materrial for Stair Well, 1946-03-20
Drawn by: L.G.W.
Traced by: L.G.W.
Scale: None
Blueprint for Cyanide Plant No. 3 Extension of Bowl Classifier Floor, Edge MAterial for Stair Welll. Drawing included is the plan, typical section, and elevation.
D-19-040 -- Trolley Beam for Cyanide No. 3 , 1946-06-12
Drawn by: H.J.S.
Traced by: H.J.S.
Scale: None
Blueprint of Trolley Beam for Cyanide Plant No. 3. Also features a list of materials required.
D-19-080 -- Proposed Office Space Dr. Mildermuth Former Jerry's Electric Store, 1956-10-15
Drawn by: H.J.S.
Scale: 1/4"
Blueprint for the proposed office space for Dr. Wildermuth, the former Jerry's Electric Store. The sheet features drawings of the plan view and elevation view - front counter and screen. The plan view contains a refraction room, waiting room, reception, fitting room, bathroom, office and shop. Also on the sheet is the charge number "00167-413"
D-19-081 -- Refinerry Frame for Air Filters, 1959-06-16
Drawn by: Warren
Traced by: L.G.W.
Blueprint for the frame for air filters in the Refinery. The sheet contains drawings of plan of top, side elevation, end elevation, section "A-A", conntection between frame and boot, and fastener. The sheer also notes the charge number "00166-393 L&M."
D-19-082 -- Sheet 1 -- Sand Dam -- Steel and Concrete Details Upper Dam Platform Replacement, 1959-08-12
Drawn by: H.J.S.
Blueprint of steel and concrete details of the upper dam platfrom replacement at the Sand Dam. The sheet features drawings of the plan view, section A-A, and beams (B1-B10). Also noted on the sheet are the charge numbers "46492 - lab // 46494 - Mat."
D-19-082 -- Sheet 2 -- Sand Dam -- Steel Details Upper Dam Platform Replacement, 1959-08-12
Drawn by: H.J.S.
Blueprint for the steel details for the upper dam platform replacement at the Sand Dam. The sheet features drawings of hand rails and floor frames. There is a table of floor frame materials list. Also on the sheet are the charge numbers "46492 - Lab. // 16494 Mat."
D-19-083 -- Transportation Dept. Oil Storage Building Proposed, 1960-05-25
Drawn by: Warren
Scale: 1/2" = 1'-10"
Blueprint of the proposed oil storage building for the Transportation Department. The sheet features drawings of the floor plan, south elevation, partial roof plan and sections, and the east elevation. Also on the sheet is the charge number "00170-001"
D-19-085 -- 18" Steel Joist Details, 1960-08-27
Drawn by: Warren
Scale: Shown
Blueprint for 18 inch Steel Joist details. The sheet features drawings of steel joist - type 18L05 (scale: 1/2" = 12"), end detail (scale: 1" = 4"), and bridging.
On the second copy are red and green marks on the steel joist and a note "Thse O.W. Joists were made in our shop and used at W. Sand Plant addition // L.J.W."