Cabinet Tan Cabinet 5
Contains 1029 Results:
8457-84 -- Decant Steady Head Tank Fabrication Details (Installed @ CC Bldg @ Mill Res.), 1983-11-02
Sheet 1 of 2
8457-84 -- Decant Steady Head Tank for Steady Flow System at C.C. Bldg. At Mill Res. Area, 1983-10-26
Sheet 1 of 2
8452-84 -- Dissolution Tank Assembly Plan w/ Three New 26' ? 32' High Tanks with Superstructure, Catwalk & Baffles, 1982-07-01
Sheet 1 of 6
8448-84 -- Assy Dwg of Relocated 20* Carbon Screen, 1983-12-07
Sheet 11 of 11
8435-83 -- Nonel Cap Storage Boards 4x4, 4x8, 6x8, 1983-09-14
The Homestake Mining Company Maps and Blueprints Collection contains a wide variety of maps, drawings, blueprints, and other documents relating to the company's operation. Blueprints consist of machines the Homestake Mining Company used and the buildings that they built. This collection also contains various geological, metallurgical, and engineering maps of the mine.
8418-83 -- Schematic Existing Decant System Slurry Pipe Line & Decant, 1983-06-16
The Homestake Mining Company Maps and Blueprints Collection contains a wide variety of maps, drawings, blueprints, and other documents relating to the company's operation. Blueprints consist of machines the Homestake Mining Company used and the buildings that they built. This collection also contains various geological, metallurgical, and engineering maps of the mine.
8414-83 -- Kent Pm 15 HD Boom Assy, 1983-06-14
Sheet 1 of 4
8414-83 -- Hydraulic/Pneumatic Schematic for PM 15 H.D. & PM20 H.D. w/ KB999, 1983-06-20
Sheet 2 of 4
8414-83 -- Kent PM 15 HD Stick Assy, 1983-07-13
Sheet 3 of 4
8414-83 -- Kent Rock Pick Boom Base Ass'y Kent PM20, 1983-07-28
Sheet 4 of 4