Skip to main content

Cabinet Tan Cabinet 9

 Container

Contains 928 Results:

CAS-196 -- Area 09-Strip/Regeneration, carbon tank overflow

 Item — Cabinet: Tan Cabinet 9
Scope and Contents From the Collection:

The Homestake Mining Company Maps and Blueprints Collection contains a wide variety of maps, drawings, blueprints, and other documents relating to the company's operation. Blueprints consist of machines the Homestake Mining Company used and the buildings that they built. This collection also contains various geological, metallurgical, and engineering maps of the mine.

Dates: 1877 - 2007

CIP Inside Tanks A3-A8 -- Area 04-Leach/CIP/ADS System, existing catwalks/stairs at CIP plant, 1991-03-08

 Item — Cabinet: Tan Cabinet 9
Scope and Contents From the Collection:

The Homestake Mining Company Maps and Blueprints Collection contains a wide variety of maps, drawings, blueprints, and other documents relating to the company's operation. Blueprints consist of machines the Homestake Mining Company used and the buildings that they built. This collection also contains various geological, metallurgical, and engineering maps of the mine.

Dates: 1991-03-08

D-60-4 -- Grizzly Gulch Tailings Dam Volume vs. Time

 Item — Cabinet: Tan Cabinet 9
Scope and Contents From the Collection:

The Homestake Mining Company Maps and Blueprints Collection contains a wide variety of maps, drawings, blueprints, and other documents relating to the company's operation. Blueprints consist of machines the Homestake Mining Company used and the buildings that they built. This collection also contains various geological, metallurgical, and engineering maps of the mine.

Dates: 1877 - 2007