Skip to main content

Property / Structures

 Subject
Subject Source: Local sources

Found in 4808 Collections and/or Records:

D-18-082 -- Main Entrance Door Frame Ross Dry, 1968-10-17

 Item — Cabinet Multi-Drawer D, Drawer: 18, Folder: 1
Scope and Contents From the Collection:

The Homestake Mining Company Maps and Blueprints Collection contains a wide variety of maps, drawings, blueprints, and other documents relating to the company's operation. Blueprints consist of machines the Homestake Mining Company used and the buildings that they built. This collection also contains various geological, metallurgical, and engineering maps of the mine.

Dates: 1968-10-17

D-18-101 -- Ross Bosses Dry Floor Plan, 1980-05-22

 Item — Cabinet Multi-Drawer D, Drawer: 18, Folder: 1
Scope and Contents From the Collection:

The Homestake Mining Company Maps and Blueprints Collection contains a wide variety of maps, drawings, blueprints, and other documents relating to the company's operation. Blueprints consist of machines the Homestake Mining Company used and the buildings that they built. This collection also contains various geological, metallurgical, and engineering maps of the mine.

Dates: 1980-05-22

D-19-019 -- Crossover for R.R. Spur to Yates Shaft, 1938-10-21, 1939-03-14

 Item — Box 1, Folder: 19
Scope and Contents

Drawn by: HJS

Scale: 1/2" = 1'-0"

Revised for 18" Gauge on 03-14-1939.

Blueprint show a section of rails at a crossover for railroad spur to the Yates Shaft.

Dates: 1938-10-21; Modified: 1939-03-14

D-19-026 -- Idler Sheave for 1-1/2 Rope Ellison Hoist No. 1, undated

 Item — Box 4, Folder: 3
Scope and Contents

Blueprint shows a top and side view of an Idler Sheave for 1-1/2 rope at the Ellison Hoist No. 1.

Dates: undated

D-19-043 -- Ellison Heating Plant Ash Disposal Flume, 1946-09-26

 Item — Box 4, Folder: 3
Scope and Contents

Drawn by: G.N.M.

Traced by: G.N.M.

Scale: None

Blueprint for the Ellison Heating Plant Ash Disposal Flum. Drawing shows the boiler foundation, Section "A-", and the typical cross section of Ash Flume.

Dates: 1946-09-26

D-19-044 -- Contour Map Area Above South Mill, 1946-09-30

 Item — Box 4, Folder: 3
Scope and Contents

Traced by: H.J.S.

Scale: 1" = 50'

Drawing features outlines of the South Mill, Refinery, Tank House, Lime Building, Warehouse, Bin, Inclining Hoist, Sub. Station, tanks, and part of Park Avenue in Lead, South Dakota. The countor lines are marked in brown.

Dates: 1946-09-30

D-19-059 -- Cold Storage Room First Aid and Mine Rescue Room Top Floor of Yates Dry, 1951-03-01

 Item — Box 4, Folder: 3
Scope and Contents

Drawn by: L.G.W.

Traced by: L.G.W.

Scale: 1" = 1'-0"

Blueprint of the cold storage room in the first aid and mine resue room on the top floor of Yates Dry. Sheet includes drawings of the plan, elevation "W-W", section of door, and section "A-A". There is a note of charge/job numbers "00081-149 - Labor // -150- Material."

Dates: 1951-03-01

D-19-074 -- No. 5 Air Shaft Entrance Road Gate, 1957-05-15

 Item — Box 4, Folder: 3
Scope and Contents

Drawn by: L.G.W.

Traced by: C.N.H.

Scale: 1" and 3"

Blueprint of the entrance road gate for the No. 5 air shaft. The sheet features drawings of the plan, front elevation view, enlarged "B"-"B", Posts, and section "A-A".

Dates: 1957-05-15

D-19-087 -- Ellison Headframe Jib Crane for Use by Diamond Drill Crew, 1962-08-08

 Item — Box 4, Folder: 3
Scope and Contents

Drawn by: Warren

Scale: 1" = 1'

Blueprint of the Jib Crane for use by Diamond Drill Crew at the Ellison Headframe. The drawing features the side view of a 1 ton jib crane to be fastened to builing column, the flanges, and a stress diagram. The sheet also noted the charge numbers "18901 Lab. // 18903 Mat."

Dates: 1962-08-08

D-20-003 -- Costs and paperwork associated with the Ross Construction, 1939-01

 Item — Cabinet Multi-Drawer D, Drawer: 20, Folder: 3
Scope and Contents From the Collection:

The Homestake Mining Company Maps and Blueprints Collection contains a wide variety of maps, drawings, blueprints, and other documents relating to the company's operation. Blueprints consist of machines the Homestake Mining Company used and the buildings that they built. This collection also contains various geological, metallurgical, and engineering maps of the mine.

Dates: 1939-01