Skip to main content

Underground Mine Infrastructures / Operations

 Subject
Subject Source: Local sources

Found in 2892 Collections and/or Records:

Vent 006 -- Ventilation Drawing, Inlet Airflow Straightener for No. 2 Booster Fan on 3500 Level, 1994-11-01

 Item — Cabinet Tan Cabinet 19
Scope and Contents From the Collection:

The Homestake Mining Company Maps and Blueprints Collection contains a wide variety of maps, drawings, blueprints, and other documents relating to the company's operation. Blueprints consist of machines the Homestake Mining Company used and the buildings that they built. This collection also contains various geological, metallurgical, and engineering maps of the mine.

Dates: 1994-11-01

Vent 007 -- Ventilation Drawing, Floating Condenser Water Skimmer Box for 7400 and 8000 Chiller Projects, 1995-02-08

 Item — Cabinet Tan Cabinet 19
Scope and Contents From the Collection:

The Homestake Mining Company Maps and Blueprints Collection contains a wide variety of maps, drawings, blueprints, and other documents relating to the company's operation. Blueprints consist of machines the Homestake Mining Company used and the buildings that they built. This collection also contains various geological, metallurgical, and engineering maps of the mine.

Dates: 1995-02-08