Sand Treatment Plant and Cynanidation
Found in 711 Collections and/or Records:
D-31-238 -- West Sand Plant Walkway Layout and Launder Changes, 00168-062 Lab. & Mat., 1961-04-19
Sheet 25
D-31-238 -- West Sand Plant Walkway Steel & Sumps, 00168-062 Lab. & Mat., 1961-05-08
Sheet 28
D-31-238 -- West Sand Plant Walkways- Steel Details, 00168-062 Lab. & Mat., 1961-05-01
Sheet 26
D-31-238 -- West Sand Plant Walkways- Steel Details, 00168-062 Lab. & Mat., 1961-05-02
Sheet 27
D-31-238 -- West Wall Details, Chg. No. 00168-052 Lab. & Mat., 1960-12-13
Sheet 11
D-31-240 -- Cyanide Plant Sluicing, 1960-08-08
Sheet 1
D-31-242 -- East Sand Plant Cyanide Storage Addition, 1961-09-19
Sheet 1
D-31-244 -- West Sand Plant Addition Columns & Brace- Steel Details, Adjustable Shutter, 1961-10-05
The Homestake Mining Company Maps and Blueprints Collection contains a wide variety of maps, drawings, blueprints, and other documents relating to the company's operation. Blueprints consist of machines the Homestake Mining Company used and the buildings that they built. This collection also contains various geological, metallurgical, and engineering maps of the mine.
D-31-245 -- West Sand Plant Addition Columns & Brace- Steel Details, South Mill, 1961-11-28
The Homestake Mining Company Maps and Blueprints Collection contains a wide variety of maps, drawings, blueprints, and other documents relating to the company's operation. Blueprints consist of machines the Homestake Mining Company used and the buildings that they built. This collection also contains various geological, metallurgical, and engineering maps of the mine.
D-31-251 -- West Sand Plant Addition Columns & Brace- Steel Details, 00057-535 Lab. & Mat., 1963-04-20
2 copies