D-19-074 -- No. 5 Air Shaft Entrance Road Gate, 1957-05-15

 Item — Box 4, Folder: 3
Scope and Contents

Drawn by: L.G.W.

Traced by: C.N.H.

Scale: 1" and 3"

Blueprint of the entrance road gate for the No. 5 air shaft. The sheet features drawings of the plan, front elevation view, enlarged "B"-"B", Posts, and section "A-A".

Dates: 1957-05-15

D-19-075 -- Transportation Office Outside of Truck Garage and North of Main Door, 1957-11-19

 Item — Box 4, Folder: 3
Scope and Contents

Drawn by: H.J.S.

Scale: 1/2" and 1"

Blueprint of the transportation office, outside of truck garage and north of main door. The sheet features drawings of the plan view, typical section, rebars, west elevation view, and south elevation view. The plan view features a counter, wood and steel file, a typewritter table, lockers, and two desks (Martin and Foreman).

Dates: 1957-11-19

D-19-076 -- Syphon House Reinforcing Schedule, 1957-06-26

 Item — Box 4, Folder: 3
Scope and Contents

Drawn by: L.G.W.

Blueprint of the reinforcing schedule for the syphon house. The sheet features drawings of the roof reinforcing plan and rebar "A", "B", "C", "D", and "E". There is a charge number noted on the sheet as "00166-257 Lab. and Mat."

Dates: 1957-06-26

D-19-077A -- Construction Layout for Angle Sleeves, undated

 Item — Box 4, Folder: 3
Scope and Contents

Sheet features the consturction layout for angle sleeves. There is a note on the drawing that states "see D-19-77".

Dates: undated

D-19-078 -- Slime Plant Platform O.S. Press Fl. Reinforced Concrete Slab, 1958-07-03

 Item — Box 4, Folder: 3
Scope and Contents

Drawn by: Warren

Traced by: L.G.W.

Scale: 1/2" and 1" = 1'-0"

Blueprint for the reinforced concrete slab for the platform O.S. Press FL. at the Slime Plant in Deadwood, South Dakota. The sheet features drawings of thepress floor, rods "A", "B", "C", "D", "E" "F", and "G", section "A-A", and section "B-B".

Dates: 1958-07-03

D-19-079 -- Ross and Yates Hoist Bldgs. Work Platforms Additions, 1958-09-12

 Item — Box 4, Folder: 3
Scope and Contents

Drawn by: Warren

Traced by: L.G.W.

Scale: 1-1/2"

Blueprint for the work platforms additions for the Ross and Yates Hoist Buildings. The sheet features drawings of bracket for extention of cage hoist rope opening work platform and angles to widden existing work platforms.

Dates: 1958-09-12

D-19-080 -- Proposed Office Space Dr. Mildermuth Former Jerry's Electric Store, 1956-10-15

 Item — Box 4, Folder: 3
Scope and Contents

Drawn by: H.J.S.

Scale: 1/4"

Blueprint for the proposed office space for Dr. Wildermuth, the former Jerry's Electric Store. The sheet features drawings of the plan view and elevation view - front counter and screen. The plan view contains a refraction room, waiting room, reception, fitting room, bathroom, office and shop. Also on the sheet is the charge number "00167-413"

Dates: 1956-10-15

D-19-081 -- Refinerry Frame for Air Filters, 1959-06-16

 Item — Box 4, Folder: 3
Scope and Contents

Drawn by: Warren

Traced by: L.G.W.

Blueprint for the frame for air filters in the Refinery. The sheet contains drawings of plan of top, side elevation, end elevation, section "A-A", conntection between frame and boot, and fastener. The sheer also notes the charge number "00166-393 L&M."

Dates: 1959-06-16

D-19-082 -- Sheet 1 -- Sand Dam -- Steel and Concrete Details Upper Dam Platform Replacement, 1959-08-12

 Item — Box 4, Folder: 3
Scope and Contents

Drawn by: H.J.S.

Blueprint of steel and concrete details of the upper dam platfrom replacement at the Sand Dam. The sheet features drawings of the plan view, section A-A, and beams (B1-B10). Also noted on the sheet are the charge numbers "46492 - lab // 46494 - Mat."

Dates: 1959-08-12

D-19-082 -- Sheet 2 -- Sand Dam -- Steel Details Upper Dam Platform Replacement, 1959-08-12

 Item — Box 4, Folder: 3
Scope and Contents

Drawn by: H.J.S.

Blueprint for the steel details for the upper dam platform replacement at the Sand Dam. The sheet features drawings of hand rails and floor frames. There is a table of floor frame materials list. Also on the sheet are the charge numbers "46492 - Lab. // 16494 Mat."

Dates: 1959-08-12