Skip to main content

Homestake Mining Company

 Organization

Found in 260 Collections and/or Records:

D-19-060 -- Sheet 1 -- Portable Fireplace for Spearfish Canyon Picnic Area -- Plan and Sections, 1951-04-20

 Item — Box: 4, Folder: 3
Scope and Contents

Drawn by: L.G.W.

Traced by: L.G.W.

Approved by: G.N.M.

Scale: 1-1/2" = 1'-0"

Plan and sections for a portable fireplace for the Spearfish Canyon Picnic Areas. The sheet features drawings of the plan, section "A-A", section "B-B", and an isometric view.

Dates: 1951-04-20

D-19-060 -- Sheet 2 -- Portable Fireplace for Spearfish Canyon Picnic Areas -- Details, 1951-04-19

 Item — Box: 4, Folder: 3
Scope and Contents Drawn by: L.G.W.Traced by: L.G.W.Approved by: G.N.M.Scale: As ShownBlueprint of details for the portable fireplace in the Spearfish Canyon Picnic Areas. The sheet features drawings of plan views (scale: 1-1/2" = 1'-0), edge views (scale: 1-1/2" = 1'-0), grate (scale: 1-1/2" = 1'-0), tie bolts (scale: 1-1/2" = 1'-0), and metal sleeve (scale: 3" = 2'-0"). The drawing has a note that states "Note: details on this sheet are for one (1) outside...
Dates: 1951-04-19

D-19-061 -- Oil & Distillate Storage Building for Shovels and Tractors, 1951-07-12

 Item — Box: 4, Folder: 3
Scope and Contents

Drawn by: L.G.W.

Traced bu: L.G.W.

Scale: 1/2"

Blueprint of the oil and distillate storage in the building for shovels and tractors. The sheet features an isometric view of the framing.

Dates: 1951-07-12

D-19-062 -- Outline Drawing of 30TPH Ice Crusher and Blower, 1951-08-02

 Item — Box: 4, Folder: 3
Scope and Contents

Drawn by: H.J.S.

Scale: 3" = 1'-0"

Blueprint of the outline drawing of 30 TPH Ice Crusher and Blower. The sheet features drawings of the section through the cursher and blower inlcuding breaker bars, feeding hoper, feed plate, cast iron drum, and 3 HP motor drum drive. Section "A-A" features a blower.

Dates: 1951-08-02

D-19-064 --Sheet 1 -- Bender Park Group Underground Service Carpenter Shop Dry Pipe Sprinkler System, 1952-03-14, 1952-03-31

 Item — Box: 4, Folder: 3
Scope and Contents

Drawn by: L.G.W.

Traced by: L.G.W.

Checked by: G.N.M.

Scale: 3/8" = 1'0"

Blueprint for the Underground Service Carpenter Shop Dry Pipe Sprinkler System in the Bender Park Group. The sheet features a drawing of place section "B-B" and section elevation "A-A".

On March 31, 1952 L.G.W. added P.I. and valve, and made it 6;-8" deep instead of 6'0".

Dates: 1952-03-14; Modified: 1952-03-31

D-19-066 -- Sinking Gardens Proposed Comfort Stations, 1953-06-10

 Item — Box: 4, Folder: 3
Scope and Contents

Drawn by: H.J.S.

Traced by: H.J.S.

Scale: 3/8"

Blueprint for the proposed comfort stations in the Sinking Gardens, in Lead, South Dakota. The sheet features drawings of floor plan - mens, floor plan - ladies, front elevation view, side elevation view, roof plan, typical section, roof section "A-A", and plot plan. There is a note for the charge number "chg. 00082-332 L&M." There is an additional note by H.S.J. that "supercedes D-11-3."

Dates: 1953-06-10

D-19-067 -- Proposed Location 50 Ft. Diam. Thickener Tank, 1954-03-10

 Item — Box: 4, Folder: 3
Scope and Contents

Drawn by: L.G.W.

Traced by: L.G.W.

Scale: 1" = 10'

blueprint for the proposed location of 50 feet diameter thickener tank. The sheet features drawings of the thickener building, water tank, thicekner tank, and a covered walkway. There are orange lines that likely represent the countour of the area.

Dates: 1954-03-10

D-19-068 -- 12" Dia. Pipe Mast For Foundry Derrick, 1955-05-05

 Item — Box: 4, Folder: 3
Scope and Contents

Drawn by: H.J.S.

Traced by: C.N.H.

Blueprint for a 12 inch diameter pipe mast for foundry Derrick. The sheet features drawings of the plan, section "A-A", section "B-B", and section "C-C".

Dates: 1955-05-05

D-19-069 -- South Mill Tank House Details for Brackets and Bracket Spreaders, 1956-11-03

 Item — Box: 4, Folder: 3
Scope and Contents

Drawn by: C.N.H

Traced by: C.N.H.

Scale: 1-1/2" = 1'-0"

Blueprint for the details for brackets and bracket spreaders in the South Mill Tank House. The sheet features drawings of the plan view, and the bracket for South Mill tank house.

Dates: 1956-11-03

D-19-070 -- Yates Shaft Lamp Room Location of New Lamp Racks, 1956-11-16

 Item — Box: 4, Folder: 3
Scope and Contents

Drawn by: L.G.W.

Approved by: C.N.K.

Scale: 3/8

Blueprint of the location of the new lamp racks in the Yates Shaft lamp room. Drawing features a floor plan or a room between the shaft and the change house. The room hows 12 racks and a sump.

Dates: 1956-11-16

Additional filters:

Type
Archival Object 239
Collection 21
 
Subject
Lead (S.D.) 136
Land 110
Townsite Agreements / Plats / Maps 93
Blueprints 90
West Main Street (Lead, S.D.) 18
∨ more
Homestake Permits 15
Floor plans 13
M.S. 487 - Elephant Lode 11
Kirk Power Plant (S.D.) 9
Surface Support Buildings and Facilites 9
Contours (Cartography) 8
Miners Avenue (Lead, S.D.) 8
South Main Street (Lead, S.D.) 8
Surface Shafts, Crushing Plants and Tramway 8
Grand Avenue (Lead, S.D.) 7
M.S. 1242 - Wyoming 7
M.S. 550 - Baxter 7
Washington Street (Lead, S.D.) 7
West Summit Street (Lead, S.D.) 7
Geology 6
Grizzly Gulch (S.D.) 6
M.S. 582 - Gordon Lode 6
M.S. 969 - Old Times Lode 6
Property / Structures 6
Spearfish Canyon (S.D.) 6
Hydroelectric power plants 5
M.S. 353 - Nun Such 5
M.S. 740 - South Star 5
Railroad Avenue (Lead, S.D.) 5
Spearfish (S.D.) 5
Third Street (Lead, S.D.) 5
Topographic maps 5
Wyoming 5
Chicago Avenue (Lead, S.D) 4
Cyanide Plant No. 3 4
Highland Avenue (Lead, S.D.) 4
Hydroelectric Plant No. 2 4
M.S. 1050 - Jingo 4
M.S. 1156 - Ethan Allen Lode 4
M.S. 1242 - Montana 4
M.S. 1450 - Old Virginia Lode 4
M.S. 205 - Mountain Rose 4
M.S. 719 - Oella 4
Main Street (Lead, S.D.) 4
Matthew Street (Lead, S.D.) 4
Mine Street (Lead, S.D.) 4
Mountain Top Field (Lead, S.D.) 4
Bender Park (Lead, S.D.) 3
Black Hills (S.D. and Wyo.) 3
Bridges 3
Central City (S.D.) 3
East Main Street (Lead, S.D.) 3
Fox Street (Lead, S.D.) 3
Iris Avenue (Lead, S.D.) 3
M.S. 1202 - Gold Run 3
M.S. 126 - Althea 3
M.S. 1395 - Rosebud Fraction 3
M.S. 1524 - St. Paul 3
M.S. 1638 - Gold Standard Fraction 3
M.S. 1680 - Lucknow 3
M.S. 238 - Northern Pacific 3
M.S. 69 - Belcher Lode 3
M.S. 723 - Comet 3
M.S. 741 - Acme Lode 3
M.S. 742 - Scotty Lode 3
M.S. 744 - Block Lode 3
M.S. 753 - Lark 3
M.S. 883 - Chicago 3
M.S. 918 - Corbutt Lode 3
Maps 3
Metallurgical 3
Park Avenue (Lead, S.D.) 3
Sawyer Street (Lead, S.D.) 3
Second Street (Lead, S.D.) 3
Sewerage 3
South Mill (Lead, S.D.) 3
Water-pipes 3
Whitewood Creek (S.D.) 3
Addie Street (Lead, S.D.) 2
Assaying 2
Barclay Avenue (Lead, S.D.) 2
Baseball 2
Baseball fields 2
Belle Fourche River (Wyo. and S.D.) 2
Blatt Street (Lead, S.D.) 2
Cemetery Street (Lead, S.D.) 2
Colorado 2
Core drilling 2
Correspondence 2
Cross Street (Lead, S.D.) 2
Cyanide Plant No. 1 (Lead, S.D.) 2
Drill core analysis 2
Drill cores 2
Drilling and boring 2
East Summit Street (Lead, S.D.) 2
Elk Creek (S.D.) 2
Employees 2
Football 2
Geochemistry 2
Gold mines and mining 2
∧ less