D-19-086 -- Spearfish Canyon Lodge Addition to Dining Room, 1960-09-24

 Item — Box: 4, Folder: 3
Scope and Contents

Drawn by: Warren

Scale: Shown

Blueprint for the addition to the dinning room at Spearfish Canyon Lodge. The sheet features drawings of the floor plan (scale: 1/2" = 1'-0"), typical section (scale: 1" = 1'-0"), west elevation, and south elevation.

Dates: 1960-09-24

D-19-087 -- Ellison Headframe Jib Crane for Use by Diamond Drill Crew, 1962-08-08

 Item — Box: 4, Folder: 3
Scope and Contents

Drawn by: Warren

Scale: 1" = 1'

Blueprint of the Jib Crane for use by Diamond Drill Crew at the Ellison Headframe. The drawing features the side view of a 1 ton jib crane to be fastened to builing column, the flanges, and a stress diagram. The sheet also noted the charge numbers "18901 Lab. // 18903 Mat."

Dates: 1962-08-08

D-19-088 -- Old High (Gusty's Shop) Additional Concrete Floor, 1961-02-06

 Item — Box: 4, Folder: 3
Scope and Contents

Drawn by: L.G.W.

Traced by: H.E.M.

Scale: 1/4" = 1'

Blueprint for the additional concrete floor at Old High (Gusty's Shop).

Dates: 1961-02-06

D-19-089 --Sheet 1 -- Reinforced Roof Truss -- Bender Park Carpenter Shop, undated

 Item — Box: 4, Folder: 3
Scope and Contents

Drawn by: L.G.W.

Scale: 3/8" = 1'-0"

Blueprint for the reinforced roof trss and the Bender Park Carpenter Shop in Lead, South Dakota.

Dates: undated

D-19-089 -- Sheet 2-- Reinforced Roof Truss -- Bender Park Carpenter Shop, undated

 Item — Box: 4, Folder: 3
Scope and Contents

Drawn by: L.G.W.

Scale: 3/8" = 1'-0"

Blueprint for the reinforced roof trss and the Bender Park Carpenter Shop in Lead, South Dakota. This sheet features notes on loads.

Dates: undated

D-19-090 -- Black Hills Operations (departmental flow sheet), undated

 Item — Box: 4, Folder: 3
Scope and Contents Organizational chart for the Black Hills Operation of the Homestake Mining Company. The manager noted on this chart is J.O. Harder, assistant manager is C.N. Kravig. The Legal Department's Chief Counsel is K. Kellar and assistant counsel is R. Driscoll. Services Division's director is D. Howe, Medical Department; chief surgeon is A. Semones, Assistant Chief is C.Clark; Personnel Department's director is J. Moodie; Public Relations Department's director is D. Howe; Recreation...
Dates: undated

D-19-091 -- Kirk Coal Bin Access Stair for Loading H.M.C. Trucks, 1963-02-28

 Item — Box: 4, Folder: 3
Scope and Contents

Drawn by: Warren

Scale: 3/4" and 1-1/2" = 1'

Blueprints for the access stair for Loading H.M.C. trucks ar the Kirk Coal Bin. The sheet features drawings of the plan, view at top of S2, channels, brace, and exp. metal treads. The sheet also has notes on the charge numbers "71101 Lab. // 71103 Mat // 82001 Lab // 82003 Mat."

Dates: 1963-02-28

D-19-092 -- Kirk Coal Bin Access Stairs for Loading HMC Trucks, 1970-02-02

 Item — Box: 4, Folder: 3
Scope and Contents

Drawn by: Luckie

Scale: 1" and 1-1/2"

Blueprint for the access stairs for loading H.M.C. Truck at the Kirk Coal Bin. This sheet features drawings of hand rail, and steel ladder.

Dates: 1970-02-02

D-19-093 -- Steel Gates Pair for 20' single for 10', 1977-05-12

 Item — Box: 4, Folder: 3
Scope and Contents

Drawn by: C.A.W.

Blueprints of steel gates, a pair for 20 feet and a single for 10 feet. The sheet features drawings of gate posts, staples, lock bolt, angle clip, and sectinon AA.

Dates: 1977-05-12

D-19-094-1 -- Kirk Power Plant -- Piping Plan (Existing), 1981

 Item — Box: 4, Folder: 3
Scope and Contents

Drawn by: EB

Blueprint shoes the exisiting piping plan at the Kirk Power Plant. The sheet features drawings of the plan view kirk income area (scale: 1/2" = 1'-0"), map of Kirk water system (scale: 1" = 100'), and an isometric view (not to scale).

Dates: 1981