D-25-063 Revised -- Map of area at St. Joseph's Hospital, Deadwood, S. Dak, 1974-09-18
Drawn By; C.N.H. (Babe Heinen)
Scale: 1" = 20'
Plastic Sepia Copy. Map of area at Saint Joseph's Hospital, Deadwood, So. Dak.. Shows Charles Street (Highway 85) and Stewart Street. Has topographic 1' contours. Has Homestake coordinates.Shows building lots and buildings and utilities. This map has updated lots, contours, and lot on the North side of Charles Street. It also now has the CB& Q (Chicago, Burlington & Quincy) Railroad Track center line.
D-25-064 -- Ross Shaft and Hoist Building Parking, 1975
Scale: 1" = 10'
Tracing Paper. Ross Shaft and Hoist Building Parking. Homestake coordinates. Has change of slope markings and approximate parking spaces.
D-25-066 -- Revision of Piggly Wiggly lot - Washington St. and E. Main St. No. 269, 1977-11-10
Scale: 1" = 20'
Tracing Paper. Revision of Piggly Wiggly Lot - Washington Street East Main Street No. 269. Homestake Coordinates. Showing spot for relocation of the Piggly Wiggly grocery store and the relocation of Washington Street. It also shows the Open Cut, Sinking Gardens Park, Tennis Courts, Basketball Court, Softball Field, Sweatman Memorial lot, and East Main Street.
D-25-067 -- Lot P, Sub'n of M.S. 1312; M.S. 249 M.S 1304 and M.S. 137, 1978-09-18
Scale: 1" = 20'
Tracing Paper. Lot P, Subdivision of M.S. 1312, M.S. 249, M.S. 1304, and M.S. 137. Showing Burlington Northern Railroad tracks, and Kirk Road. Section 34 of T.5N. R.3E. B.H.M.
Showing claims Big Silfer M.S., Glenn Geary M.S. 1312, Last Chance No. 3 M.S. 249, Shekell M.S. 1304, and Spotted Horse Chief M.S. 137.
D-25-070 -- Preliminary treatment plant flow diagram, 1982-10-14
Drawn By: S.L.R.
Scale: Not To Scale
Tracing Paper. Preliminary Treatment Plant Flow Diagram
D-25-071 -- Preliminary Treatment Plant, Piping and Instrument Diagram P & ID, 1982-10-15
Drawn By: S.L.R.
Scale: Not To Scale
Tracing Paper. Preliminary Treatment Plant Piping and Instrument Diagram P & ID.
D-25-072 -- Preliminary Wastewater Treatment Plant General Layout, Plan View, 1982-10-18
Scale: 1" = 50'
Tracing Paper. Preliminary Wasterwater Treatment Plant General Layout Plan View. No surrounding location labels, just a plant layout.
D-25-073 -- Preliminary Wastewater Treatment Plant Flow Sheet, Elevation View, 1982-11-02
Drawn By: No one listed
Traced By: G.G.
Checked: A.B.B.
Scale: 1" = 10'-0"
Date: 11/02/1982
Tracing Paper. Preliminary Wastewater Treatment Plant Flow Sheet Elevation View.
D-25-074 -- Preliminary Watewater Treatment Plant Progress Schedule, Chart, 1982 - 1985
Tracing Paper. Preliminary Wastewater Treatment PlantProgress Schedule. Shows Time line for construction of the wastewater treatment by individual steps starting in Dec. 1982 and completion in Spet. 1984.
D-25-076 -- Steady Flow System Monitor Control Equipment Layout, Moved TCN Monitor #1 from Carbon Cone Bldg to Heat Exchg. Bldg., 1983-05-13
Drawn By: S.R.
Scale: 1" = 20'
Tracing Paper. Steady Flow System Monitor Control Equipment Layout. Has Homestake Coordinates. Shows Yates Compressor Building, Mill Reservoir, and Old Carbon Cone Building No. 3.