Homestake Mining Company. Engineering Department
Found in 284 Collections and/or Records:
D-9-005 -- Electrical Depeartment Motor Wash Room, 1946-04-02
Drawn by: L.G.W.
Traced by: L.G.W.
Scale: 1" = 1"-0"
Drawing show a 12 inch diameter vent stack and a 6 in diameter vent stack for the Electral Department's Motor Wash Room, order number, 5112.
D-9-006 -- Brick Lintel for Electrical. Dept. Motor Wash Room, 1946-04-02
Drawn by: H.J.S.
Scale: 1-1/2" = 1'-0"
Drawing shows teh brick lintel for the Electrical Department's Motor Wash Room.
D-9-007 -- Outdoor Fireplace, 1946-06-13
Drawn by: H.J.S.
Traced by: H.J.S.
Scale: 1/2" = 1'-0"
Drawing of the front, side, and top view of an outdoor fireplace.
D-11-001 -- Wyoming Vanadium Project Guest House, 1942-10-20
Drawn by: Morthland
Scale: 1/4" = 1'-0"
Drawing features the floor plant of the Wyoming Vanadium Project Guest House. The Floor plan as a living room, bedroom, a bathroom, a dinette-kitchen and a porch.
In the second copy the walls are highlighted in orange.
D-11-002 -- Wyoming Vanadium Project Preliminary Plan of Mess Hall, 1942-10-22
Drawn by: Pyle
Revied by Pyle on 10-23-1942 "Front doors changed to 2'-6 x 6'-8."
Scale: 3/32" = 1'-0"
Drawing features a floor plan of the Mess Hall for the Wyoming Vanadium Project. Drawing features a dinning room with nine tables with benches, a kitchen with a meat cooler, vegetable cooler, and other storage, a porch, and a room to store coal.
D-11-003 -- Open Cut 33KV Power Line Detail of Crossarms, 1982-07-09
Drawn by: S.L.R.
Scale: 1" = 1'
Drawing features the details of the cross arms for a 33KV Power Line for the Open Cut.
D-11-004 -- Dam at 1700' Star Pillar Crosscut, 1984-04-12
Drawn by: DM
SCale: 1/2" = 1'
Drawing features pipe detials and rails for the Dam at 1700 foot level in the Star Pillar Crosscut.
D-19-012 -- Steel Hanger for Mine Tracing Cabinet, 1932-04-26
Traced by: GNM
Job No. 15662
Blueprint of a steel hanger for Mine Tracing Cabinet for the Homestake Mining Company. On the lower right hand corner is a seal with "Engineers Office // Homestake Mining Co. // J.D. Johnson // Chief Eng. // R.S.F." in it.
D-19-013 -- Table Cabinet for Main Office of Homestake Mining Company, 1933-03-08
Scale: 1" = 1'-0"
Blueprint features the front elevation, end elevation, and plan under top of a table cabinet for the main office of Homestake Mining Company. On the lower right hand corner is a seal with "Engineers Office // Homestake Mining Co. // J.D. Johnson // Chief Eng. // G.N.M." in it.
D-19-018 -- Detail of No. 9 Frog Surface Tramway, 1934-07-28
Do not scale
Blueprint of Section A-A of the No. 9 Frog on the surface tramway On the lower right hand corner is a seal with "Engineers Office // Homestake Mining Co. // J.D. Johnson // Chief Eng. // H.J.S." in it.
