Box 4
Contains 113 Results:
D-19-087 -- Ellison Headframe Jib Crane for Use by Diamond Drill Crew, 1962-08-08
Drawn by: Warren
Scale: 1" = 1'
Blueprint of the Jib Crane for use by Diamond Drill Crew at the Ellison Headframe. The drawing features the side view of a 1 ton jib crane to be fastened to builing column, the flanges, and a stress diagram. The sheet also noted the charge numbers "18901 Lab. // 18903 Mat."
D-19-094-3 -- Kirk Power Plant -- Proposed Final Plan, 1981-07-16
Blueprint for the proposed final plan at the Kirk Power Plant. The sheet features drawings of the plan view (scale: 1/2" = 1'-0"), the elvation view (not to scale), elevation view side (not to scale), sketch final plan, map of Kirk Water System (scale: 1: = 100') and detail B (Hearst II Tank) (scale: 1/8" = 1'-0").
D-19-094-4 -- Kirk Water Service, 1984-02-07
Blueprint of the Kirk Water Service. The sheet features the turbine room, boiler room, centrifuge room, 33KV Sub, a railroad, Whitetail Creek, a warehouse, 14" Hearst Siphon, surge tank, 12 inch lines, 8 inch lines, overflow line, Old Abe siphons, valve house, drains, and a retaining wall. The sheet includes a legend. The sheet has lines in both red (Homestake Mining Company lines) and green (Black Hills Power and Light lines).
D-19-095-1 -- Contour Map -- Yates Mine Office and Yates Dry, 1983-05-06, 1983-05-12
Drawn by: C.N.H.
Scale: 1" = 10'
Contour Map of the Yates Mine Office and Yates Dry. The sheet show Yates Dry, Yares Mine Office, Lawn, Shop Road, and a concrete sidewalk. There is a legend on the sheet and estimated quantities of materials. There is also a note on the sheet that states "Proposed road widening near Yates Dry - DM May 12 '83."
D-19-095-2 -- Contour Map - Yates Mine Office and Yates Dry, 1983-05-06
Drawn by: C.N.H.
Scale: 1" = 10'
Contour Map of the Yates Mine Office and Yates Dry. The sheet show Yates Dry, Yares Mine Office, Lawn, Shop Road, and a concrete sidewalk.
D-19-088 -- Old High (Gusty's Shop) Additional Concrete Floor, 1961-02-06
Drawn by: L.G.W.
Traced by: H.E.M.
Scale: 1/4" = 1'
Blueprint for the additional concrete floor at Old High (Gusty's Shop).
D-19-089 --Sheet 1 -- Reinforced Roof Truss -- Bender Park Carpenter Shop, undated
Drawn by: L.G.W.
Scale: 3/8" = 1'-0"
Blueprint for the reinforced roof trss and the Bender Park Carpenter Shop in Lead, South Dakota.
D-19-089 -- Sheet 2-- Reinforced Roof Truss -- Bender Park Carpenter Shop, undated
Drawn by: L.G.W.
Scale: 3/8" = 1'-0"
Blueprint for the reinforced roof trss and the Bender Park Carpenter Shop in Lead, South Dakota. This sheet features notes on loads.
D-19-090 -- Black Hills Operations (departmental flow sheet), undated
D-19-091 -- Kirk Coal Bin Access Stair for Loading H.M.C. Trucks, 1963-02-28
Drawn by: Warren
Scale: 3/4" and 1-1/2" = 1'
Blueprints for the access stair for Loading H.M.C. trucks ar the Kirk Coal Bin. The sheet features drawings of the plan, view at top of S2, channels, brace, and exp. metal treads. The sheet also has notes on the charge numbers "71101 Lab. // 71103 Mat // 82001 Lab // 82003 Mat."