Box 4

 Container

Contains 113 Results:

D-19-034 -- Toilet Partitions for Spearfish Sawmill, 1944-09-20

 Item — Box: 4, Folder: 3
Scope and Contents

Drawn by: G.N.M.

Scale: None

Blueprint for the toilet partititons for the Spearfish Sawmill. Features drawings of the plan view, front elevation - view "A-A", and side elevations - views "B-B".

Dates: 1944-09-20

D-19-035 -- Traveler Wheel, 1945-02-28

 Item — Box: 4, Folder: 3
Scope and Contents

Drawn by: L.G.W.

Traced by: L.G.W.

Scale: Full Size

Blueprint of a Traveler Wheel, features a front at profile view of the wheel. The drawing also has a note that states "Required - 32 // Order No. 439-9179"

Dates: 1945-02-28

D-19-036 -- Organization Chart of the Engineering and Construction Departments, 1946-03-14

 Item — Box: 4, Folder: 3
Scope and Contents Organization Chart for the Engineering and Construction Departments. In 1946 the Engineering and Construction Departments were headed by the Chief Engineer and Assistant Chief Engineer. Below the Chief Engineer were the Drafts men, construction formen, timekeepers, chief surface surveyor, chief mine surveyor, water and property engineer, and the transportation forman. Under the construction forement is the assistant foreman, carpenters, masons, labor forman, shopmen, paint...
Dates: 1946-03-14

D-19-037 -- Standard Door Frame for 6 Inch Concrete Wall, 1946-03-30

 Item — Box: 4, Folder: 3
Scope and Contents

Drawn by: H.J.S.

Scale: 1-1/2" = 1'-0"

Blueprint for a standard foor dram for a 6 inch concrete wall. Drawing include the side jamb, head, jmab, and spreader bar. The drawing also features a table of required materials.

Dates: 1946-03-30

D-19-037A -- Cyanide No. 3 Extension of Bowl Classifier Floor Edge Materrial for Stair Well, 1946-03-20

 Item — Box: 4, Folder: 3
Scope and Contents

Drawn by: L.G.W.

Traced by: L.G.W.

Scale: None

Blueprint for Cyanide Plant No. 3 Extension of Bowl Classifier Floor, Edge MAterial for Stair Welll. Drawing included is the plan, typical section, and elevation.

Dates: 1946-03-20

D-19-038 -- Standard Door Frame for 12 Inch Brick Wall, 1946-04-02

 Item — Box: 4, Folder: 3
Scope and Contents

Drawn by: H.J.S.

Scale: 1-1/2" = 1'-0"

Blueprint for the standard door frame for a 12 inch brick wall, features drawings of the side jamb, head, jamb, and spreader bar. The drawing also includes a table of required materials.

Dates: 1946-04-02

D-19-040 -- Trolley Beam for Cyanide No. 3 , 1946-06-12

 Item — Box: 4, Folder: 3
Scope and Contents

Drawn by: H.J.S.

Traced by: H.J.S.

Scale: None

Blueprint of Trolley Beam for Cyanide Plant No. 3. Also features a list of materials required.

Dates: 1946-06-12

D-19-041 -- Repair Collars for Hydro-Electric No. 2 Pipe Line, 1946-06-15

 Item — Box: 4, Folder: 3
Scope and Contents

Drawn by: G.N.M.

Traced by: G.N.M.

Scale 3/4" = 1'-0"

Blueprint for repair collars fro teh Hydro-electric No. 2 pipe line. Drawings include the end view - large end, elevation, and end view - small end. Also on the drawing is a note about "repaid collar for connecting 60" redwood stave pipe to 50"k redwood stave pipe."

Dates: 1946-06-15

D-19-042 -- Lead Country Club Table Arrangement for 58 Guests, 1946-09-09

 Item — Box: 4, Folder: 3
Scope and Contents

Drawn by: H.J.S.

Traced by: H.J.S.

Scale: 1/4" = 1'-0"

Floor plan of a table arrangement for 58 guest at the Lead Country Club. The floor plan includes the kitchen and five tables.

Dates: 1946-09-09

D-19-043 -- Ellison Heating Plant Ash Disposal Flume, 1946-09-26

 Item — Box: 4, Folder: 3
Scope and Contents

Drawn by: G.N.M.

Traced by: G.N.M.

Scale: None

Blueprint for the Ellison Heating Plant Ash Disposal Flum. Drawing shows the boiler foundation, Section "A-", and the typical cross section of Ash Flume.

Dates: 1946-09-26