Box 4
Contains 113 Results:
D-19-034 -- Toilet Partitions for Spearfish Sawmill, 1944-09-20
Drawn by: G.N.M.
Scale: None
Blueprint for the toilet partititons for the Spearfish Sawmill. Features drawings of the plan view, front elevation - view "A-A", and side elevations - views "B-B".
D-19-035 -- Traveler Wheel, 1945-02-28
Drawn by: L.G.W.
Traced by: L.G.W.
Scale: Full Size
Blueprint of a Traveler Wheel, features a front at profile view of the wheel. The drawing also has a note that states "Required - 32 // Order No. 439-9179"
D-19-036 -- Organization Chart of the Engineering and Construction Departments, 1946-03-14
D-19-037 -- Standard Door Frame for 6 Inch Concrete Wall, 1946-03-30
Drawn by: H.J.S.
Scale: 1-1/2" = 1'-0"
Blueprint for a standard foor dram for a 6 inch concrete wall. Drawing include the side jamb, head, jmab, and spreader bar. The drawing also features a table of required materials.
D-19-037A -- Cyanide No. 3 Extension of Bowl Classifier Floor Edge Materrial for Stair Well, 1946-03-20
Drawn by: L.G.W.
Traced by: L.G.W.
Scale: None
Blueprint for Cyanide Plant No. 3 Extension of Bowl Classifier Floor, Edge MAterial for Stair Welll. Drawing included is the plan, typical section, and elevation.
D-19-038 -- Standard Door Frame for 12 Inch Brick Wall, 1946-04-02
Drawn by: H.J.S.
Scale: 1-1/2" = 1'-0"
Blueprint for the standard door frame for a 12 inch brick wall, features drawings of the side jamb, head, jamb, and spreader bar. The drawing also includes a table of required materials.
D-19-040 -- Trolley Beam for Cyanide No. 3 , 1946-06-12
Drawn by: H.J.S.
Traced by: H.J.S.
Scale: None
Blueprint of Trolley Beam for Cyanide Plant No. 3. Also features a list of materials required.
D-19-041 -- Repair Collars for Hydro-Electric No. 2 Pipe Line, 1946-06-15
Drawn by: G.N.M.
Traced by: G.N.M.
Scale 3/4" = 1'-0"
Blueprint for repair collars fro teh Hydro-electric No. 2 pipe line. Drawings include the end view - large end, elevation, and end view - small end. Also on the drawing is a note about "repaid collar for connecting 60" redwood stave pipe to 50"k redwood stave pipe."
D-19-042 -- Lead Country Club Table Arrangement for 58 Guests, 1946-09-09
Drawn by: H.J.S.
Traced by: H.J.S.
Scale: 1/4" = 1'-0"
Floor plan of a table arrangement for 58 guest at the Lead Country Club. The floor plan includes the kitchen and five tables.
D-19-043 -- Ellison Heating Plant Ash Disposal Flume, 1946-09-26
Drawn by: G.N.M.
Traced by: G.N.M.
Scale: None
Blueprint for the Ellison Heating Plant Ash Disposal Flum. Drawing shows the boiler foundation, Section "A-", and the typical cross section of Ash Flume.