Box 4
Contains 113 Results:
D-19-044 -- Contour Map Area Above South Mill, 1946-09-30
Traced by: H.J.S.
Scale: 1" = 50'
Drawing features outlines of the South Mill, Refinery, Tank House, Lime Building, Warehouse, Bin, Inclining Hoist, Sub. Station, tanks, and part of Park Avenue in Lead, South Dakota. The countor lines are marked in brown.
D-19-045 -- Access Stairway Ash Handling Crane Kirk Power Station, 1946-10-21
Drawn by: H.J.S.
Traced: H.J.S.
Scale: None
Blueprint for the Access Stairway for the Ash Handling Crane at teh Kirk Power Station. The sheet features drawings of the plan, side views, and view "A-A".
D-19-046 -- Sheet 1 -- Reno Pipe Bridge -- Steel Erection, 1947-07-05
Drawn by: L.G.W.
Traced by: L.G.W.
Approved by: G.N.M.
Scale: 3/4" = 12"
Bluerprint for the Reno Pipe Bridge, steel erection. Sheet features drawings of the plan, side elevation, and end elevation.
D-19-046 -- Sheet 2 -- Reno Pipe Bridge -- Steel, 1947-07-07, 1947-07-10
Drawn by: L.G.W.
Traced by: L.G.W.
Approved by: G.N.M.
Scale = 1" and 3" = 23"
Blueprint of the Renop Pipe Bridge, Steel. The sheet features drawings of Bridge stringers, and bridge beams. On July 10, 1947, L.G.W. made changes in the beams. There is also a not of "account No. 62411."
D-19-047 -- Engineering Department -- Supply Cabinet -- Drafting Room, 1947-09-17
Drawn by: L.G.W.
Traced by: L.G.W.
Scale: 1-1/2" = 12"
Blueprint of a supply cabinent in the drafting room for the Engineering Department. Sheet features drawing of the plan of top, side elevation, front, elevation, and isometric (shown without the doors). The drawing also notes "Charge #7142."
D-19-048 -- Hanna Pump Station -- Kitchen Cabinets -- Ed Dryer Residence, 1947-09-23
Drawn by: L.G.W.
Traced by: L.G.W.
Approved by: G.N.M.
Scale: 1" = 12"
Blueprint for the Kitchen Cabinets for the Ed Dryer Residence at the Hanna Pump Station. The sheet includes drawings of plan of top, front elevation, front elevation (framing details), and section "A-A". Drawing has a note of "Charge # 62312."
D-19-049 -- Turnout Sump Cover Main Spearfish Pipe Line, 1947-09-24
Drawn by: L.G.W.
Traced by: L.G.W.
Approved by: G.N.M.
Scale: 3/4" = 1"
Blueprint of turnour sump cover for the main Spearfish Pipeline. Sheet features drawings of the plan of sump cover, and section elevation. Also noted on the drawing is "Charge #62413" and written in pencil "this cover did not fit see DWg D-19-49A."
D-19-049A -- Turnout Sump Cover Main Spearfish Pipe Line, 1947-10-18
Drawn by: L.G.W.
Traced by: L.G.W.
Scale: None
Blueprint for the turnout sump cover for the main Spearfish pipe line. Drawing features the plan drawing for the turnour sump over. Also noted on the drawing is "Charge # 62412."
D-19-050 -- Screen for Covering Elk Creek Ditch Sump, 1947-10-09
Drawn by: L.G.W.
Traced by: L.G.W.
Approved by: G.N.M.
Scale: 1-1/2" = 12"
Blueprint for the screen covering at the Elk Creek Ditch Sump. Sheet features drawings showing the plan and section elevation. The drawing also notes "Charge #62481."
D-19-051 -- Plan for 1000 Gal Septic Tank and Dry Well, 1948-07-01, 1948-07-10
Drawn by: H.J.S.
Traced by: H.J.S.
Scale: 1/2" = 1'-0"
Blueprint for a 1000 galon septic tank and dry well. Sheet features the plan of 1000 galon septic tanks, section, roof plan, and plan of dry well and section. There is a table for "Dimensions for Various Size Tanks (Residential)".
On July 10, 1948 H.J.S. altered the roof reinforcing on the drawing.