Cabinet 5
Container
Contains 326 Results:
10" Piping & Steady Head Tanks- Cylones South Mill, 1986-12-12
Item — Cabinet: 5, Drawer: 1
Scope and Contents
Sheet 4
Dates:
1986-12-12
Piping Primary Cyclone Overflow Tanks, 1987-01-29
Item — Cabinet: 5, Drawer: 1
Scope and Contents
Sheet 11
Dates:
1987-01-29
Piping From Cyclone Overflow Sump to Concrete Sump #1,2,3 Ball Mills, 1987-01-27
Item — Cabinet: 5, Drawer: 1
Scope and Contents
Sheet 12
Dates:
1987-01-27
Mill Solution Piping for Concrete Steady Head Tanks [Secondary Cyclone System), 1987-01-09
Item — Cabinet: 5, Drawer: 1
Scope and Contents
Sheet 9
Dates:
1987-01-09
Additional Support for Deflector ? 10" Cyclone Piping, 1987-01-06
Item — Cabinet: 5, Drawer: 1
Scope and Contents
Sheet 8
Dates:
1987-01-06
Platforms for Steady Head Tanks, [10" Piping System for Secondary Cyclone), 1987-01-14
Item — Cabinet: 5, Drawer: 1
Scope and Contents
Sheet 10
Dates:
1987-01-14
8" Water Line Piping Change Lower Regrind Area Req for Clearance of Slurry Line, 1986-12-16
Item — Cabinet: 5, Drawer: 1
Scope and Contents
Sheet 7
Dates:
1986-12-16
10" Cyclone Pipe Suport and Entry Platform, 1986-12-15
Item — Cabinet: 5, Drawer: 1
Scope and Contents
Sheet 5
Dates:
1986-12-15
10" Cyclone Piping- Support for Piping, 1986-12-15
Item — Cabinet: 5, Drawer: 1
Scope and Contents
Sheet 6
Dates:
1986-12-15
10" Piping to Cyclones South Mill, 1986-12-10
Item — Cabinet: 5, Drawer: 1
Scope and Contents
Sheet 3
Dates:
1986-12-10