Cabinet 7
Contains 1714 Results:
F-32-A-283 -- Foundation and Foundation Form 800 Dresser Strata Bore Raise Drill, 1971-02-12
The Homestake Mining Company Maps and Blueprints Collection contains a wide variety of maps, drawings, blueprints, and other documents relating to the company's operation. Blueprints consist of machines the Homestake Mining Company used and the buildings that they built. This collection also contains various geological, metallurgical, and engineering maps of the mine.
F-32-A-287 -- Joy Slusher (3 dr.) Mount Under Mill Tramway Floor, 1972-10-14
The Homestake Mining Company Maps and Blueprints Collection contains a wide variety of maps, drawings, blueprints, and other documents relating to the company's operation. Blueprints consist of machines the Homestake Mining Company used and the buildings that they built. This collection also contains various geological, metallurgical, and engineering maps of the mine.
F-32-A-291 -- Sinking Hoist Foundation. Oro Hondo Hoist Big Drumb #6- Shaft, 1973-08-30
The Homestake Mining Company Maps and Blueprints Collection contains a wide variety of maps, drawings, blueprints, and other documents relating to the company's operation. Blueprints consist of machines the Homestake Mining Company used and the buildings that they built. This collection also contains various geological, metallurgical, and engineering maps of the mine.
F-32-A-292 -- Mounting for Sinking Sheave Wheels 7100 ft. Level #6 Shaft Deepening, 1973-10-19
Sheet 1
F-32-A-292 -- Dump Chute Assy for Sinking from 7100 to 8000 ft. Level #6 Shaft, 1973-10-25
Sheet 2
F-32-A-292 -- No 6 Shaft 7100 Sinking Chute for Dumping Bucket, 1970-01-06
Sheet 3
F-32-A-292 -- Deep Level Winze No 7 6800' to 8000 Steel Details, 1973-11-23
Sheet 4
F-32-A-292 -- Winze 7 Steel Details for Round Shaft, 1976-01-08
Sheet 4A
F-32-A-292 -- Deep Level Winze No 7- 6800 to 8000 Steel Details, 1973-11-27
Sheet 5
F-32-A-292 -- Deep Level No 7 Winze Hoist Foundation Re-bar Plan, 1975-03-26
Sheet 7A