A-31-039-4 -- Homestake Mining Co., B & M Hoist No. 2, Lead, S. Dakota, 1930-08-29

 Item — Cabinet: Multi-Drawer A, Drawer: 31, Folder: 2
Scope and Contents

Drawn By: F.G.Z.

Scale: 1/8" = 1'-0"

Blueprint paper copy. General Section view Homestake Mining Company B & M No. 2 Hoist Building (Also known as Old Abe No. 2 Hoist Building), Lead, South Dakota. View showing main water lines, and valves. "Automatics" Sprinkler Corp. of America, Youngstown, Ohio.

Dates: 1930-08-29

A-33-001 -- Plan of Crossovers Homestake 22" Gauge Tramway Track with Burlington Standard Gauge Track at the New Shop Location East of Ellison Hoist, 1925-03-10

 Item — Cabinet: Multi-Drawer A, Drawer: 33, Folder: 1
Scope and Contents

Drawn By: A.L. Coolidge

Scale: 3/4" = 1'-0"

Linen original. Plan of cross-overs between the Homestake Tramway track, the Burlington standard gauge track "A" and the Burlington standard gauge track "B". There are 2 coss-overs one at the Burlington "A" with cross-over "A" and Burlington "B" with cross-over "B". This was located new shop location East of the Ellison Hoist building.

Dates: 1925-03-10

A-33-003 -- Homestake Mining Company, Proposed Auto Repair Shop

 Item — Cabinet: Multi-Drawer A, Drawer: 33, Folder: 1
Scope and Contents

Drawn By: None

Scale: 1/4" = 1'-0"

Onionskin tracing paper originaL. Proposed Auto Repair Shop. Showing floor plan and 2 exterior views.

Dates: 1877 - 2007

A-33-004 -- Homestake Mining Company, Proposed Auto Repair Shop

 Item — Cabinet: Multi-Drawer A, Drawer: 33, Folder: 1
Scope and Contents

Scale: 1/4" = 1'-0"

Onionskin tracing paper originaL. Proposed Auto Repair Shop. Showing ceiling floor plan and 2 section views showing trusses.

Dates: 1877 - 2007

A-33-005 -- Total Length of Tunnel ???? Ft, Timbered Part 100 Ft.

 Item — Cabinet: Multi-Drawer A, Drawer: 33, Folder: 1
Scope and Contents

Scale: 1" = 1'-0"

Heavy paper and drawn with pencil. Tunnel layout with 12" iron pipe on floor and Posts and box around the pipe. Total length of tunnel originally said 1159 feet but was erased. The first 100 feet of the tunnel will be timbered. There is a tunnel cross-section and a longitudinal section. There are several views of the box around the pipe. No mention of location.

Dates: 1877 - 2007

A-33-007 -- Proposed 30 Inch Weir at Charles Street Sump Deadwood S.D., 1924-10-20

 Item — Cabinet: Multi-Drawer A, Drawer: 33, Folder: 1
Scope and Contents

Drawn By: J.D.J. & Fraser

Scale: Varies

Linen original. Proposed 30 inch weir at Charles Street Sump, Deadwood, S.D.. Has Plan View, End Elevation View, Section, anddetails for a Weir Lock. It does mention a 10" line to Slimes Plant.

Dates: 1924-10-20

A-33-014 -- Section Map of Township 6 North, 7 North & 8 North and Range 1 East & 2 East, Red Water River

 Item — Cabinet: Multi-Drawer A, Drawer: 33, Folder: 1
Scope and Contents

Blueprint paper copy. Section Map of Township 6 North, 7 North & 8 north and Range 1 East and Range 2 East. Showing Red Water River, C&NW Railroad (Chicago & Northwestern), and property owners.

Dates: 1877 - 2007

A-33-015 -- Section Map of Township 7 North & 8 North and Range 1 East & 2 East. Wyoming & South Dakota State Line, Spearfish Creek, and Red Water River.

 Item — Cabinet: Multi-Drawer A, Drawer: 33, Folder: 1
Scope and Contents

Blueprint paper copy. Section Map of Township 7 North & 8 North and Range 1 East & 2 East. Showing Wyoming & South Dakota State Line, Red Water River, Spearfish Creek, and property owners.

Dates: 1877 - 2007

A-33-016 -- Section Map of Township 9 North & 10 North and Range 6 East & 7 East. North Canal and Proposed Syphon to Willow Creek Lateral

 Item — Cabinet: Multi-Drawer A, Drawer: 33, Folder: 1
Scope and Contents

Blueprint paper copy. Section Map of Township 9 North & 10 North and Range 6 East & 7 East. Showing North Canal, Willow Creek, Willow Creek Lateral, Dry Creek, C&NW Railroad (Chicago & Northwestern), and property owners.

Dates: 1877 - 2007