Cabinet Tan Cabinet 8
Container
Contains 1068 Results:
7105-75 -- slime piping layout sand dam arrea, 1977-02-14
Item — Cabinet: Tan Cabinet 8
Scope and Contents
Sheet 1
Dates:
1977-02-14
7105-75 -- cell manifold piping slime tails at sand dam, 1977-02-24
Item — Cabinet: Tan Cabinet 8
Scope and Contents
Sheet 2
Dates:
1977-02-24
7105-75 -- details of slime tails line into grizzly gulch to overflow sump, 1977-03-02
Item — Cabinet: Tan Cabinet 8
Scope and Contents
Sheet 3
Dates:
1977-03-02
7105-75 -- slime tails pipe support, 1977-03-03
Item — Cabinet: Tan Cabinet 8
Scope and Contents
Sheet 4
Dates:
1977-03-03
7081-75 -- anchor for aerial tramway grizzly gulch pipeline, 1976-11-19
Item — Cabinet: Tan Cabinet 8
Scope and Contents
Sheet 1
Dates:
1976-11-19
7081A-75 -- aerial tramway towerrs grizzly gulch pipelilne, 1976-11-22
Item — Cabinet: Tan Cabinet 8
Scope and Contents
Sheet 2
Dates:
1976-11-22
7081B-75 -- sheave pins and lower sheave arrangement grizzly gulch pipeline, 1976-11-23
Item — Cabinet: Tan Cabinet 8
Scope and Contents
Sheet 3
Dates:
1976-11-23
7081C-75 -- trolley for aerial tramwal, 1976-12-22
Item — Cabinet: Tan Cabinet 8
Scope and Contents
Sheet 4
Dates:
1976-12-22
7081D-75 -- stift leg for aerial tramway pollution control, 1977-02-03
Item — Cabinet: Tan Cabinet 8
Scope and Contents
Sheet 5
Dates:
1977-02-03
6822-75 -- main ducts mine and engr. Bldg. ventilation plan view of zones, 1974-07-06
Item — Cabinet: Tan Cabinet 8
Scope and Contents
Sheet 1
Dates:
1974-07-06