6821-78 -- metallurgical dept. reclaiming reservoir piping diagram 18", 1977-01-05
Item — Cabinet: Tan Cabinet 8
Scope and Contents
Sheet 56
Dates:
1977-01-05
6821-78 -- metallurgical dept. slurry pump room cyclone pump line, 1977-02-04
Item — Cabinet: Tan Cabinet 8
Scope and Contents
Sheet 62
Dates:
1977-02-04
6821-78 -- metallurgical dept. sand dam cyclones sump layout, 1977-02-08
Item — Cabinet: Tan Cabinet 8
Scope and Contents
Sheet 63
Dates:
1977-02-08
6821-78 -- metallurgical dept. cyclone piping elev. And pipe details, 1977-02-16
Item — Cabinet: Tan Cabinet 8
Scope and Contents
Sheet 64
Dates:
1977-02-16
6821-78 -- metallurgical dept. reclaiming reservoir access steps and clips, 1977-02-23
Item — Cabinet: Tan Cabinet 8
Scope and Contents
Sheet 65
Dates:
1977-02-23
6821-78 -- metallurgical dept. sand dam cyclone separator sump, 1978-03-14
Item — Cabinet: Tan Cabinet 8
Scope and Contents
Sheet 66
Dates:
1978-03-14
6821-78 -- metallurgical dept. sand dam cyclone separator plan and steel details, 1977-02-28
Item — Cabinet: Tan Cabinet 8
Scope and Contents
Sheet 66A
Dates:
1977-02-28
6821-78 -- metallurgical dept. sand dam cyclone separator steel details, 1977-03-01
Item — Cabinet: Tan Cabinet 8
Scope and Contents
Sheet 66B
Dates:
1977-03-01
6821-78 -- metallurgical dept. sand dam cyclone separator steel details and plan view, 1977-02-02
Item — Cabinet: Tan Cabinet 8
Scope and Contents
Sheet 66C
Dates:
1977-02-02
6821-78 -- metallurgical dept. thickener pump room door frame details, 1977-03-08
Item — Cabinet: Tan Cabinet 8
Scope and Contents
Sheet 67
Dates:
1977-03-08