Skip to main content

Englewood Hydro-Electric Plant (S.D.)

 Subject
Subject Source: Local sources

Found in 3 Collections and/or Records:

A-31-011-2 -- Homestake Mining Co., Englewood Group "O" & Hanna Group "P", 1958-03-26

 Item — Cabinet New 1, Drawer: 1, Folder: 1
Scope and Contents Drawn By: R.H.R.Scale: 1" = 50'Tracing Paper original. Map shows the Englewood Bulding Group "O" and the Hanna Building Group "P" and numbered buildings. Homestake Mining Company Building Group "O" for Englewood Power Plant (5.5 miles south of Lead, SD) along Whitewood Creek. Map shows the Power Plant, Whitewood Creek, CB&Q Railroad (Chicago, Burlington & Quincy) tracks, and pipelines. Homestake Mining Company Building Group "P" for the Hanan Pump Station...
Dates: 1958-03-26

A-31-014 -- Englewood Power Plant Group "O"

 Item — Cabinet New 1, Drawer: 1, Folder: 1
Scope and Contents

Scale: 1" = 50'

Linen original. Homestake Mining Company, Englewood, S.D., Building Group "O". Shwing buildings labelled with group letter and number. Showing Homestake Englewood Power Plant, residence, water lines, water hydrants, and road.

Dates: 1877 - 2007

Hydroelectric and Kirk Power Plant Operation Records

 Collection
Identifier: 5033
Abstract

The Hydroelectric and Kirk Power Plant Operation Records consists of daily operation logs from the Homestake Mining Company's power plants. The bulk of the records date between 1918 and 1965.

Dates: Majority of material found within 1918 - 1965; 1918 - 1998