D-19-037A -- Cyanide No. 3 Extension of Bowl Classifier Floor Edge Materrial for Stair Well, 1946-03-20

 Item — Box 4, Folder: 3
Scope and Contents

Drawn by: L.G.W.

Traced by: L.G.W.

Scale: None

Blueprint for Cyanide Plant No. 3 Extension of Bowl Classifier Floor, Edge MAterial for Stair Welll. Drawing included is the plan, typical section, and elevation.

Dates: 1946-03-20

D-19-077B -- East Sand Plant Wood Stave Sewer Pipe Metal Sleeves, 1957-05-12

 Item — Box 4, Folder: 3
Scope and Contents

Drawn by: L.G.W.

Scale" 1" = 1'

Blueprint for the metal sleeves for the wood stave sewer pipe in the East Sand Plant. The sheet features drawings of wood stave connection sleeve and angle connection sleeve. Also on the sheet is the charge number "00167-402 Lab. and Mat."

Dates: 1957-05-12

D-19-081 -- Refinerry Frame for Air Filters, 1959-06-16

 Item — Box 4, Folder: 3
Scope and Contents

Drawn by: Warren

Traced by: L.G.W.

Blueprint for the frame for air filters in the Refinery. The sheet contains drawings of plan of top, side elevation, end elevation, section "A-A", conntection between frame and boot, and fastener. The sheer also notes the charge number "00166-393 L&M."

Dates: 1959-06-16

D-25-088 Sheet 1 -- Zinc Precipitation System, 1983-11-30

 Item — Cabinet Multi-Drawer D, Drawer: 25, Folder: 1
Scope and Contents

Drawn By: S.L.R.

Scale: 1 1/2" = 1"-0"

Tracing Paper. Zinc Precipitation System. The Zinc Precipitaion System Flow sheet of West Sand Plant, Leachers Shack, Press Floor, and Pump Room.

Sheet 1 of 3

Dates: 1983-11-30

D-25-088 Sheet 2 -- Zinc Precipitation Control Wiring Diagram, 1983-12-14

 Item — Cabinet Multi-Drawer D, Drawer: 25, Folder: 1
Scope and Contents

Drawn By: G.G.

Tracing Paper. Zinc Precipitation System Control Wiring Diagram.

Sheet 2 of 3

Dates: 1983-12-14

D-25-088 Sheet 3 -- Zinc Precipitation Control Wiring Diagram, 1983-12-05

 Item — Cabinet Multi-Drawer D, Drawer: 25, Folder: 1
Scope and Contents

Drawn By: G.G.

Tracing Paper. Zinc Precipitation Control Wiring Diagram. Showing Wiring in The Press Floor Remote Rack #3.

Sheet 3 of 3

Dates: 1983-12-05

D-26-099 -- Cyanide Sand Plant No. 3 Ball Mill Dischg. Box Detail Drawing, 1933-08-12

 Item — Cabinet Multi-Drawer D, Drawer: 26, Folder: 1
Scope and Contents

Drawn By: Pyle

Traced By: Schmidt

Scale: 1 1/2"= 12" and 3" = 12"

Pape BlackLine Copy, Cyanide Sand Plant N0.3, Ball Mill Discharge Box, Detail Drawing. Plan View with 3 Sections, Second Plan with an Elevation and a section.

Dates: 1933-08-12

D-26-100 -- Cyanide Sand Plant No. 3 Feed Trough for Model "D" Class., 1933-07-10

 Item — Cabinet Multi-Drawer D, Drawer: 26, Folder: 1
Scope and Contents

Drawn By: Pyle

Traced By: C.S.

Scale: 3" = 12"

Paper BlackLine Copy, Cyanide Sand Plant No. 3, Feed Trough for Model "D" Classifier. Plan View with front elevation and 2 sections. Multiple views of Splitter (sections and plans).

Dates: 1933-07-10

D-26-101 -- Cyanide Sand Plant No. 3 6'x12'8 Dorr Model "D" Classifier General Drawing, 1933-07-01

 Item — Cabinet Multi-Drawer D, Drawer: 26, Folder: 1
Scope and Contents

Drawn By: Pyle

Traced By: C.E.S.

Scale: 3/4" = 12"

Paper Black Line Copy, Cyanide Sand Plant No. 3, 6'x21'-8" Dorr Model "D" Classifier, General Drawing. Partial Plan and an elevation view.

Dates: 1933-07-01

D-26-102 -- Cyanide Sand Plant No. 3 Model "D" Class. Launder Changes, 1933-07-07

 Item — Cabinet Multi-Drawer D, Drawer: 26, Folder: 1
Scope and Contents

Drawn By: Pyle

Traced By: C.E.S.

Scale: 1 1/2" = 12"

Paper Black Line Copy. Cyanide Sand Plant No. 3, Model "D" Classifier, Launder Changes. Partial Plan, Elevation, Section, and view of altered positions.

Dates: 1933-07-07