Metallurgical
Found in 3764 Collections and/or Records:
8091-82 -- Walkway for Rod Mill Conveyors at South Mill Installation, 1982-02-02
Sheet 2 of 2
8092-82 -- Dust Hood for Sample Splitter (Jones) Assay Office, 1982-02-03
Sheet
8093-82 -- Dust Hood for Sample Splitter (Jones) Assay Office, 1982-02-03
The Homestake Mining Company Maps and Blueprints Collection contains a wide variety of maps, drawings, blueprints, and other documents relating to the company's operation. Blueprints consist of machines the Homestake Mining Company used and the buildings that they built. This collection also contains various geological, metallurgical, and engineering maps of the mine.
8096-65 -- duct adapter for 12" flexable tubing Assay Office, 1982-01-08
The Homestake Mining Company Maps and Blueprints Collection contains a wide variety of maps, drawings, blueprints, and other documents relating to the company's operation. Blueprints consist of machines the Homestake Mining Company used and the buildings that they built. This collection also contains various geological, metallurgical, and engineering maps of the mine.
8101-82 -- Ash Pump Concrete Layout For #1 Sump- South Mill, 1982-02-15
Sheet 1 of 12
8101-82 -- Connecting Stairs for Upper & Lower Catwalks S. Mill, 1982-03-19
Sheet 10 of 12
8101-82 -- Cyclone Stand Details South Mill, 1982-03-01
Sheet 3 of 12
8101-82 -- Cyclone Stand Steel Details Column & Brace South Mill, 1982-03-03
Sheet 5 of 12
8101-82 -- Hand Rails for Cyclone Walkways South Mill South Mill
Sheet 12 of 12
8101-82 -- Piping Plan & Details from Sump to Ash Pumps South Mill, 1981-02-15
Sheet 2 of 12