Skip to main content

Metallurgical

 Subject
Subject Source: Local sources

Found in 3764 Collections and/or Records:

D-19-081 -- Refinerry Frame for Air Filters, 1959-06-16

 Item — Box 4, Folder: 3
Scope and Contents

Drawn by: Warren

Traced by: L.G.W.

Blueprint for the frame for air filters in the Refinery. The sheet contains drawings of plan of top, side elevation, end elevation, section "A-A", conntection between frame and boot, and fastener. The sheer also notes the charge number "00166-393 L&M."

Dates: 1959-06-16

D-21-005 -- West Sand Plant Sand Raise Bldg. Concrete Floor, 1961-01-03

 Item — Cabinet Multi-Drawer D, Drawer: 21, Folder: 1
Scope and Contents From the Collection:

The Homestake Mining Company Maps and Blueprints Collection contains a wide variety of maps, drawings, blueprints, and other documents relating to the company's operation. Blueprints consist of machines the Homestake Mining Company used and the buildings that they built. This collection also contains various geological, metallurgical, and engineering maps of the mine.

Dates: 1961-01-03

D-21-036 -- Cyanide Sand Plant No 3 Replacement Beam- VF 27, 1968-01-02

 Item — Cabinet Multi-Drawer D, Drawer: 21, Folder: 1
Scope and Contents From the Collection:

The Homestake Mining Company Maps and Blueprints Collection contains a wide variety of maps, drawings, blueprints, and other documents relating to the company's operation. Blueprints consist of machines the Homestake Mining Company used and the buildings that they built. This collection also contains various geological, metallurgical, and engineering maps of the mine.

Dates: 1968-01-02

D-21-051 -- Refinery Addition Exhaust Fan Duct, 1968-06-04

 Item — Cabinet Multi-Drawer D, Drawer: 21, Folder: 1
Scope and Contents From the Collection:

The Homestake Mining Company Maps and Blueprints Collection contains a wide variety of maps, drawings, blueprints, and other documents relating to the company's operation. Blueprints consist of machines the Homestake Mining Company used and the buildings that they built. This collection also contains various geological, metallurgical, and engineering maps of the mine.

Dates: 1968-06-04

D-21-052 -- Refinery Addition Spiral Stairway Frame, 1969-05-27

 Item — Cabinet Multi-Drawer D, Drawer: 21, Folder: 1

D-21-057 -- Openings for Services Refinery Addition, 1969-07-19

 Item — Cabinet Multi-Drawer D, Drawer: 21, Folder: 1

D-21-058 -- Equipment Layout Refinery Addition, 1969-06-30

 Item — Cabinet Multi-Drawer D, Drawer: 21, Folder: 1

D-21-059 -- Refinery Addition Furnace Mounting Beams, 1970-01-12

 Item — Cabinet Multi-Drawer D, Drawer: 21, Folder: 1