Metallurgical
Subject
Subject Source: Local sources
Found in 3764 Collections and/or Records:
E-80-4 -- South Stamp Mill - Water Supply-Constant Head Tanks, 1952-09-09
Item — Cabinet 12, Drawer: 4, Folder: South Mill Folder 5
Scope and Contents
Sheet 8
Dates:
1952-09-09
E-80-5 - South Mill- Unit No. 4 General Layout, 1955-12-06
Item — Cabinet 3, Drawer: 5
Scope and Contents
Sheet 5
Dates:
1955-12-06
E-80-5 - South Mill- Unit No. 4 Pump Foundation and Sump Below Ball Mill FL., 1955-11-14
Item — Cabinet 3, Drawer: 5
Scope and Contents
Sheet 9
Dates:
1955-11-14
E-80-5 - South Mill- Unit No. 4 Pump, Pit, and Sump, 1955-11-07
Item — Cabinet 3, Drawer: 5
Scope and Contents
Sheet 7
Dates:
1955-11-07
E-80-5 - South Mill- Waterpiping Around Unit No. 4, 1956-01-05
Item — Cabinet 3, Drawer: 5
Scope and Contents
Sheet 10
Dates:
1956-01-05
E-80-6 - South Mill - Steel Details Gathering Hopper for Transporto Weigher, 1955-09-01
Item — Cabinet 3, Drawer: 5
Scope and Contents
Sheet 2
Dates:
1955-09-01
E-80-6 - South Mill- Unit No. 4 Amalgamator at Ball Mill Discharge, 1955-12-31
Item — Cabinet 3, Drawer: 5
Scope and Contents
Sheet 13
Dates:
1955-12-31
E-80-6 - South Mill- Unit No. 4 Conveyor No. 14 Erection Details, 1955-11-02
Item — Cabinet 3, Drawer: 5
Scope and Contents
Sheet 7
Dates:
1955-11-02
E-80-6 - South Mill- Unit No. 4 Discharge Hopper from Conveyor No. 14, 1955-12-14
Item — Cabinet 3, Drawer: 5
Scope and Contents
Sheet 12
Dates:
1955-12-14
E-80-6 - South Mill- Unit No. 4 Erection Plans- Primary Cyclones (D-20) & MISC. Peir Locations, Details, 1955-12-03
Item — Cabinet 3, Drawer: 5
Scope and Contents
Sheet 9
Dates:
1955-12-03