Winzes
Subject
Subject Source: Local sources
Found in 1244 Collections and/or Records:
F-32-A-274 -- Deep Level Project No 6 Shaft Station Gate Catch, 1975-10-14
Item — Cabinet 7, Drawer: 6
Scope and Contents
Sheet 107
Dates:
1975-10-14
F-32-A-274 -- Deep Level Project- Spill Pocket Below Last Productive Level Distances for Future Sinking No 6 Shaft, 1973-03-22
Item — Cabinet 7, Drawer: 6
Scope and Contents
Sheet 99
Dates:
1973-03-22
F-32-A-274 -- Fleeting Sheave Braces 4850 Level #6 Shaft, 1971-07-22
Item — Cabinet 7, Drawer: 6
Scope and Contents
Sheet 62
Dates:
1971-07-22
F-32-A-274 -- Fleeting Sheave for Sinking 4850 ft. Level #6 Shaft, 1971-05-05
Item — Cabinet 7, Drawer: 6
Scope and Contents
Sheet 58
Dates:
1971-05-05
F-32-A-274 -- Fleeting Sheave Layout for Sinking 4850 ft Level #6 Shaft, 1971-11-08
Item — Cabinet 7, Drawer: 6
Scope and Contents
Sheet 75
Dates:
1971-11-08
F-32-A-274 -- Lacing Back for 6800 No 6 Crosshead Platform, 1971-08-13
Item — Cabinet 7, Drawer: 6
Scope and Contents
Sheet 66
Dates:
1971-08-13
F-32-A-274 -- No 6 Engine Room Beam Details 4550 Level, 1971-10-25
Item — Cabinet 7, Drawer: 6
Scope and Contents
Sheet 69
Dates:
1971-10-25
F-32-A-274 -- No 6 Engine Room Beam Details 4550 Level, 1971-10-30
Item — Cabinet 7, Drawer: 6
Scope and Contents
Sheet 70
Dates:
1971-10-30
F-32-A-274 -- No 6 Engine Room Beam Details 4550 Level, 1971-11-02
Item — Cabinet 7, Drawer: 6
Scope and Contents
Sheet 71
Dates:
1971-11-02
F-32-A-274 -- No 6 Engine Room Bolt & Foundation Plan 4550 Level, 1971-02-22
Item — Cabinet 7, Drawer: 6
Scope and Contents
Sheet 49
Dates:
1971-02-22