Skip to main content

Diamond Drilling

 Subject
Subject Source: Local sources

Found in 175 Collections and/or Records:

1550 foot level, 9 Ledge, N83-84 Stope, Underground Ore Estimate File, 1992

 File — Box 5, Folder: 1
Scope and Contents

Homestake Ore Reserve file for the 1550 Level, 9 Ledge, N83-84 Stope. Used for Kadri's Study 8/92. Containing cross-sections, plan maps, stope ore back sample maps, and diamond drill holes used to make the ore estimate.

Dates: 1992

1700 foot level, 7 Ledge, N61-63 Stope, Underground Ore Estimate File, 1992

 File — Box 5, Folder: 2
Scope and Contents

Homestake Ore Reserve file for the 1700 Level, 7 Ledge, N61-63 Stope. Used for Kadri's Study 8/92. Containing cross-sections, plan maps, stope ore back sample maps, and diamond drill holes used to make the ore estimate.

Dates: 1992

1740-1-60 -- Drain Pipe & Plug Diamond Drill Holes Designed by Carlson, 1921-08-08

 Item — Cabinet 2, Drawer: 2, Folder: 60
Scope and Contents From the Collection:

The Homestake Mining Company Maps and Blueprints Collection contains a wide variety of maps, drawings, blueprints, and other documents relating to the company's operation. Blueprints consist of machines the Homestake Mining Company used and the buildings that they built. This collection also contains various geological, metallurgical, and engineering maps of the mine.

Dates: 1921-08-08

1850 foot level, 7 Ledge, N56-59 Stope, Underground Ore Estimate File, 1992

 File — Box 5, Folder: 3
Scope and Contents

Homestake Ore Reserve file for the 1850 Level, 7 Ledge, N56-59 Stope. Used for Kadri's Study 8/92. Containing cross-sections, plan maps, stope ore back sample maps, and diamond drill holes used to make the ore estimate.

Dates: 1992

2300 foot level, 9 Ledge, N47-49 Stope, Underground Ore Estimate File, 1992

 File — Box 5, Folder: 4
Scope and Contents

Homestake Ore Reserve file for the 2300 Level, 9 Ledge, N47-49 Stope. Used for Kadri's Study 8/92. Containing cross-sections, plan maps, stope ore back sample maps, and diamond drill holes used to make the ore estimate.

Dates: 1992

2711 -- Golden Reward Diamond Drilling, 1965 - 1966

 Item — Cabinet 13, Drawer: 9
Scope and Contents From the Collection:

The Homestake Mining Company Maps and Blueprints Collection contains a wide variety of maps, drawings, blueprints, and other documents relating to the company's operation. Blueprints consist of machines the Homestake Mining Company used and the buildings that they built. This collection also contains various geological, metallurgical, and engineering maps of the mine.

Dates: 1965 - 1966

2714 -- Diamond Drill Holes 22-23-24-25 Winze #5

 Item — Cabinet 13, Drawer: 9
Scope and Contents From the Collection:

The Homestake Mining Company Maps and Blueprints Collection contains a wide variety of maps, drawings, blueprints, and other documents relating to the company's operation. Blueprints consist of machines the Homestake Mining Company used and the buildings that they built. This collection also contains various geological, metallurgical, and engineering maps of the mine.

Dates: 1877 - 2007

2900'-3500' No.7 Ledge Diamond Drill Program - 2900' Level View 75' Slice Above & Below, 1999-01-13

 Item — Cabinet 12, Drawer: 8
Scope and Contents From the Collection:

The Homestake Mining Company Maps and Blueprints Collection contains a wide variety of maps, drawings, blueprints, and other documents relating to the company's operation. Blueprints consist of machines the Homestake Mining Company used and the buildings that they built. This collection also contains various geological, metallurgical, and engineering maps of the mine.

Dates: 1999-01-13

2900'-3500' No.7 Ledge Diamond Drill Program - 3050' Level View 75' Slice Above & Below, 1999-01-13

 Item — Cabinet 12, Drawer: 8
Scope and Contents From the Collection:

The Homestake Mining Company Maps and Blueprints Collection contains a wide variety of maps, drawings, blueprints, and other documents relating to the company's operation. Blueprints consist of machines the Homestake Mining Company used and the buildings that they built. This collection also contains various geological, metallurgical, and engineering maps of the mine.

Dates: 1999-01-13

2900'-3500' No.7 Ledge Diamond Drill Program - 3050' Level View 75' Slice Above & Below, 1999-01-13

 Item — Cabinet 12, Drawer: 8
Scope and Contents From the Collection:

The Homestake Mining Company Maps and Blueprints Collection contains a wide variety of maps, drawings, blueprints, and other documents relating to the company's operation. Blueprints consist of machines the Homestake Mining Company used and the buildings that they built. This collection also contains various geological, metallurgical, and engineering maps of the mine.

Dates: 1999-01-13