Underground Mine Infrastructures / Operations
Found in 2892 Collections and/or Records:
9386-68 -- 10" WF at 45th beam clamp and U-bolt for staging in #4 winze skiploaderr 7450 level (34 winze skiploader), 1988-03-27
The Homestake Mining Company Maps and Blueprints Collection contains a wide variety of maps, drawings, blueprints, and other documents relating to the company's operation. Blueprints consist of machines the Homestake Mining Company used and the buildings that they built. This collection also contains various geological, metallurgical, and engineering maps of the mine.
9387-68 -- #4 winze new deep level development 7100 reinforcement beams, 1988-03-31
Sheet 2
9387-68 -- #4 winze skip loader on 7400 lower platform from cage side, 1988-03-31
Sheet 1
9388-68 -- #4 winze cage hoist 4:1 gearset for dial drive, 1988-04-01
The Homestake Mining Company Maps and Blueprints Collection contains a wide variety of maps, drawings, blueprints, and other documents relating to the company's operation. Blueprints consist of machines the Homestake Mining Company used and the buildings that they built. This collection also contains various geological, metallurgical, and engineering maps of the mine.
9405-90 -- Cage Comp Screens for 6800 Level for Oiling Ropes #6 Shaft, 1988-05-02
The Homestake Mining Company Maps and Blueprints Collection contains a wide variety of maps, drawings, blueprints, and other documents relating to the company's operation. Blueprints consist of machines the Homestake Mining Company used and the buildings that they built. This collection also contains various geological, metallurgical, and engineering maps of the mine.
9409-90 -- 20" Pipe Support for 6950 Refrigeration Room, 1988-05-19
Sheet 5
9409-90 -- 6950 Bulk Air Cooler, 1988-06-09
Sheet 3 of 3
9409-90 -- 7100 Bulk Air Cooler Fans, Pumps, Electrics, 1988-02-29
Sheet 1 of 3
9409-90 -- 7100 Level- Bulk Air Cooler Piping, 1988-05-04
Sheet 2 of 3
9409-90 -- Hanger Bracket for 20" Pipe in 6950 Refrigeration Room, 1988-05-13
Sheet 4