Underground Mine Infrastructures / Operations
Found in 2892 Collections and/or Records:
A9626-90 -- Details for Modified Cage Doors #6 Winze Cage #6 Cage, 1989-05-12
Sheet 1 of 3
A9749-90 -- Fan Discharge Door for Kirk Fan Mine Ventilation, 1990-01-25
Sheet 1 of 3
A9825-90 -- Crane Layout for 6800 #6 Shaft North Drift Shop #6 Shaft Misc.- Cranes & Trolleys, 1990-05-30
Sheet 1 of 2
A9903-90 -- Modified Scrubber Chamber for 6800' North Drift Project Ventilation, 1990-10-03
Sheet 1 of 2
A9924-90 -- Bottom Floor Assy. For #6 Shaft Double Deck Cage #6 Cage, 1990-12-05
Sheet 1 of 13
A10064-90 Revision 1 -- 30 Ton Rifrigeration Unit New Style (ESP Design) Mine Ventilation, 1991-09-21
Sheet 1 of 6
A10116-90 -- Lifting Beams for 6800 #6 Shaft Pump Station, 1992-02-09
The Homestake Mining Company Maps and Blueprints Collection contains a wide variety of maps, drawings, blueprints, and other documents relating to the company's operation. Blueprints consist of machines the Homestake Mining Company used and the buildings that they built. This collection also contains various geological, metallurgical, and engineering maps of the mine.
A10183-90 -- #6 Shaft Skip Dump Crane #6 Skip Dump, 1992-08-03
Sheet 1 of 2
A10186-90 -- Aluminum Cage Gate for #4 Winze, 1992-08-13
The Homestake Mining Company Maps and Blueprints Collection contains a wide variety of maps, drawings, blueprints, and other documents relating to the company's operation. Blueprints consist of machines the Homestake Mining Company used and the buildings that they built. This collection also contains various geological, metallurgical, and engineering maps of the mine.
A10368-91 -- switch at #6 shaft end of vent drift between air door and main line, 1993-07-05
Sheet 1