Underground Mine Infrastructures / Operations
Subject
Subject Source: Local sources
Found in 2892 Collections and/or Records:
F-32-A-274 -- 6950 #6 Shaft Break-through, 1984-12-13
Item — Cabinet 7, Drawer: 6
Scope and Contents
Sheet 107
Dates:
1984-12-13
F-32-A-274 -- 7100 No 6 Shaft Station
Item — Cabinet 7, Drawer: 6
Scope and Contents
Sheet 102
Dates:
1877 - 2007
F-32-A-274 -- Below 6800 No 6 Shaft Curtailment, and Distances Needed for Future Sinking, 1971-11-15
Item — Cabinet 7, Drawer: 6
Scope and Contents
Sheet 99A
Dates:
1971-11-15
F-32-A-274 -- Deep Level Project #6 Shaft 5600 Station Correction Steel, 1975-10-01
Item — Cabinet 7, Drawer: 6
Scope and Contents
Sheet 105
Dates:
1975-10-01
F-32-A-274 -- Deep Level Project #6 Shaft Skip Dump Walkway 5600, 1975-10-14
Item — Cabinet 7, Drawer: 6
Scope and Contents
Sheet 106
Dates:
1975-10-14
F-32-A-274 -- Deep Level Project 15 Ton Engine Room Crane Plane & Elev.- Steel Details, 1971-04-10
Item — Cabinet 7, Drawer: 6
Scope and Contents
Sheet 51A
Dates:
1971-04-10
F-32-A-274 -- Deep Level Project 15 Ton Engine Room Crane Steel Details, 1971-04-17
Item — Cabinet 7, Drawer: 6
Scope and Contents
Sheet 51S
Dates:
1971-04-17
F-32-A-274 -- Deep Level Project 15 Ton Engine Room Crane Steel Details, 1971-04-15
Item — Cabinet 7, Drawer: 6
Scope and Contents
Sheet 51C
Dates:
1971-04-15
F-32-A-274 -- Deep Level Project 15 Ton Engine Room Crane Steel Details, 1971-04-13
Item — Cabinet 7, Drawer: 6
Scope and Contents
Sheet 51B
Dates:
1971-04-13
F-32-A-274 -- Deep Level Project 800 Strato Bore Drill Mach. Transport Truck Details, 1971-03-10
Item — Cabinet 7, Drawer: 6
Scope and Contents
Sheet 53
Dates:
1971-03-10