Underground Mine Infrastructures / Operations
Subject
Subject Source: Local sources
Found in 2892 Collections and/or Records:
F-32-A-292 -- Deep Level No 7 Winze Hoist Foundation Re-bar Plan, 1975-03-26
Item — Cabinet 7, Drawer: 6
Scope and Contents
Sheet 7A
Dates:
1975-03-26
F-32-A-292 -- Deep Level No 7 Winze Hoist Gear Mounting Frame, 1975-04-14
Item — Cabinet 7, Drawer: 6
Scope and Contents
Sheet 25
Dates:
1975-04-14
F-32-A-292 -- Deep Level No 7 Winze Shaft Special Gate & Floor Plate, 1975-10-16
Item — Cabinet 7, Drawer: 6
Scope and Contents
Sheet 27
Dates:
1975-10-16
F-32-A-292 -- Deep Level Project No 7 Winze Work Platform, 1975-04-21
Item — Cabinet 7, Drawer: 6
Scope and Contents
Sheet 26
Dates:
1975-04-21
F-32-A-292 -- Deep Level Project No 7 Winze Work Platform, 1975-04-22
Item — Cabinet 7, Drawer: 6
Scope and Contents
Sheet 26A
Dates:
1975-04-22
F-32-A-292 -- Deep Level Winze No 7 6800' to 8000 Steel Details, 1973-11-23
Item — Cabinet 7, Drawer: 6
Scope and Contents
Sheet 4
Dates:
1973-11-23
F-32-A-292 -- Deep Level Winze No 7- 6800 to 8000 Steel Details, 1973-11-27
Item — Cabinet 7, Drawer: 6
Scope and Contents
Sheet 5
Dates:
1973-11-27
F-32-A-292 -- Dump Chute Assy for Sinking from 7100 to 8000 ft. Level #6 Shaft, 1973-10-25
Item — Cabinet 7, Drawer: 6
Scope and Contents
Sheet 2
Dates:
1973-10-25
F-32-A-292 -- Hoist Room Crane Column Bolts Layout. #7 Shaft Hoist Room, 1974-09-04
Item — Cabinet 7, Drawer: 6
Scope and Contents
Sheet 14
Dates:
1974-09-04
F-32-A-292 -- Mounting for Sinking Sheave Wheels 7100 ft. Level #6 Shaft Deepening, 1973-10-19
Item — Cabinet 7, Drawer: 6
Scope and Contents
Sheet 1
Dates:
1973-10-19