Bender Park (Lead, S.D.)
Subject
Subject Source: Local sources
Found in 4 Collections and/or Records:
A-31-003-2 -- Homestake Mining Co., Lead, S.D., Bender Park Group "A", 1958-02-25
Item — Cabinet New 1, Drawer: 1, Folder: 1
Scope and Contents
Drawn By: R.H.R.Scale: 1" = 50'Linen Original. Homestake Mining Company's Building Group "A", Bender Park Sawmill. Map shows the Bender Park complex with Carpenter Shop, Warehouse, and Lumber Storage sheds. The Homestake General Manager Residence, waterlines, water hydrants, and the CB&Q (Chicago, Burlington & Quincy) Railroad tracks. Has Homestake Coordinates.The following buildings are also identified:
A1 - Pipe Shed & Warehouse
A2 -...
Dates:
1958-02-25
D-19-064 --Sheet 1 -- Bender Park Group Underground Service Carpenter Shop Dry Pipe Sprinkler System, 1952-03-14, 1952-03-31
Item — Box 4, Folder: 3
Scope and Contents
Drawn by: L.G.W.
Traced by: L.G.W.
Checked by: G.N.M.
Scale: 3/8" = 1'0"
Blueprint for the Underground Service Carpenter Shop Dry Pipe Sprinkler System in the Bender Park Group. The sheet features a drawing of place section "B-B" and section elevation "A-A".
On March 31, 1952 L.G.W. added P.I. and valve, and made it 6;-8" deep instead of 6'0".
Dates:
1952-03-14; Modified: 1952-03-31
D-19-089 --Sheet 1 -- Reinforced Roof Truss -- Bender Park Carpenter Shop, undated
Item — Box 4, Folder: 3
Scope and Contents
Drawn by: L.G.W.
Scale: 3/8" = 1'-0"
Blueprint for the reinforced roof trss and the Bender Park Carpenter Shop in Lead, South Dakota.
Dates:
undated
D-19-089 -- Sheet 2-- Reinforced Roof Truss -- Bender Park Carpenter Shop, undated
Item — Box 4, Folder: 3
Scope and Contents
Drawn by: L.G.W.
Scale: 3/8" = 1'-0"
Blueprint for the reinforced roof trss and the Bender Park Carpenter Shop in Lead, South Dakota. This sheet features notes on loads.
Dates:
undated
