Skip to main content

Surface Support Buildings and Facilites

 Subject
Subject Source: Local sources

Found in 17 Collections and/or Records:

A-31-010-2 -- Homestake Mining Co., Hydro No. 2 Group "M", 1957-12-18

 Item — Cabinet New 1, Drawer: 1, Folder: 1
Scope and Contents Drawn By: R.H.R.Scale: 1" = 50'Size: 22.5" x 34.5"Date: 12/18/1957Detailed Description: Linen original. Shows the Hydro Electric No. 2 Power Plant (Labeled as "M1") along Spearfish Creek. Next to the plant is U.S. Highway 14A between Savoy and Hydroelectric Power Plant No. 1. The drawing features three tanks with their capacities listed other buildings such as a garage, two sheds, a building labeled "Dwelling M2", and an unlabeled building....
Dates: 1957-12-18

A-31-021-1 -- Spearfish Sawmill Group "BB", 1958-03-10

 Item — Cabinet Multi-Drawer A, Drawer: 31, Folder: 2
Scope and Contents

Drawn By: R.H.R.

Scale: 1" = 50'

Linen. Spearfish Sawmill Group "BB" (Sheet 1 0f 6 Sheets). Has Homestake Coordinates. Shows part of the Timber Yard and wire fence.

Dates: 1958-03-10

A-31-021-2 -- Spearfish Sawmill Group "BB", 1958-03-14

 Item — Cabinet Multi-Drawer A, Drawer: 31, Folder: 2
Scope and Contents

Drawn By: R.H.R.

Scale: 1" = 50'

Linen. Spearfish Sawmill Group "BB" Sheet 2 of 6 sheets. Has Homestake Coordinates. Shows Timber Yard, Lumber Yard, and wire fence.

Dates: 1958-03-14

A-31-021-3 -- Spearfish Sawmill Group "BB", 1958-03-15

 Item — Cabinet Multi-Drawer A, Drawer: 31, Folder: 2
Scope and Contents

Drawn By: R.H.R.

Scale: 1" = 50'

Linen. Spearfish Sawmill Group "BB" Sheet 3 of 6 Sheets. Has Homestake Coordinates. Shwos Sawmill Buildings, wire fence, and Timber Yard.

Dates: 1958-03-15

A-31-021-4 -- Spearfish Sawmill Group "BB", 1958-03-15

 Item — Cabinet Multi-Drawer A, Drawer: 31, Folder: 2
Scope and Contents

Drawn By: R.H.R.

Scale: 1" = 50'

Linen. Spearfish Sawmill Group "BB" Sheet 4 of 6 Sheets. Has Homestake coordinates. Shows Lumber Yard, Timber Yard, wire fence, and some sawmill buildings.

Dates: 1958-03-15

A-31-021-5 -- Spearfish Sawmill Group "BB", 1958-03-18

 Item — Cabinet Multi-Drawer A, Drawer: 31, Folder: 2
Scope and Contents

Drawn By: R.H.R.

Scale: 1" = 50'

Linen. Spearfish Sawmill Group "BB" Sheet 5 of 6 Sheets. Has Homestake Coordinates. Shows Highway, sawmill buildings, and wire fence.

Dates: 1958-03-18

A-31-021-6 -- Spearfish Sawmill Group "BB", 1958-03-18

 Item — Cabinet Multi-Drawer A, Drawer: 31, Folder: 2
Scope and Contents

Drawn By: R.H.R.

Scale: 1" = 50'

Linen. Spearfish Sawmill Group "BB" Sheet 6 of 6 Sheets. Has Homestake Coordinates. Shows Highway, wire fence, and log storage area.

Dates: 1958-03-18

A-33-072 -- Map of Break in Hydro #2 Wood Stave Pipe Line, 1974-07-28

 Item — Cabinet Multi-Drawer A, Drawer: 33, Folder: 1
Scope and Contents

Drawn By: H.J.S.

Scale: 1" = 20'

Linen original. Map of break in Hydro-Electric No. 2 52" Wood stave pipeline. Approximately 1/2 mile below American Siding. Coordinates are labelled as assumed. Has 5' contours. Shows where pipeline enters South Portal of Long Tunnel. Has plan and profile view.

Dates: 1974-07-28

D-9-002 -- Auto Repair Shop & Garage Window Details, 1941-08-19

 Item — Box 1, Folder: 17
Scope and Contents

Drawn by: R.S.F.

Drawing shows a typical section of a window header and window sill for the Auto Repair Shop and Garage.

Dates: 1941-08-19

D-19-021 -- Plan Relocation of 22 In. Gauge Track at East End Machine Shop, 1938-11-07, 1939-03-14

 Item — Box 4, Folder: 3
Scope and Contents

Drawn by: HJS

Scale: 1" = 10'

Drawing features a plan for the relocation of 22 inch guage track at the east end of the Machine Shop. Also featured on the drawing is a section labeled as Wash Rack.

Dates: 1938-11-07; Modified: 1939-03-14