Skip to main content

Surface Support Buildings and Facilites

 Subject
Subject Source: Local sources

Found in 1676 Collections and/or Records:

D-18-072 -- Divider Partition Ex-Ray Storage Cabinets Homestake Hospital, 1966-11-29

 Item — Cabinet Multi-Drawer D, Drawer: 18, Folder: 1
Scope and Contents From the Collection:

The Homestake Mining Company Maps and Blueprints Collection contains a wide variety of maps, drawings, blueprints, and other documents relating to the company's operation. Blueprints consist of machines the Homestake Mining Company used and the buildings that they built. This collection also contains various geological, metallurgical, and engineering maps of the mine.

Dates: 1966-11-29

D-18-073 -- Englewood Chlorinator Support & Bracket Chlorine Manifold Support, 1966-12-09

 Item — Cabinet Multi-Drawer D, Drawer: 18, Folder: 1
Scope and Contents From the Collection:

The Homestake Mining Company Maps and Blueprints Collection contains a wide variety of maps, drawings, blueprints, and other documents relating to the company's operation. Blueprints consist of machines the Homestake Mining Company used and the buildings that they built. This collection also contains various geological, metallurgical, and engineering maps of the mine.

Dates: 1966-12-09

D-18-079 -- Load Bulkhead for Trailer No 6 at Spearfish Sawmill (for Creede Haul), 1968-07-25

 Item — Cabinet Multi-Drawer D, Drawer: 18, Folder: 1
Scope and Contents From the Collection:

The Homestake Mining Company Maps and Blueprints Collection contains a wide variety of maps, drawings, blueprints, and other documents relating to the company's operation. Blueprints consist of machines the Homestake Mining Company used and the buildings that they built. This collection also contains various geological, metallurgical, and engineering maps of the mine.

Dates: 1968-07-25

D-18-081 -- Fan Duct Cover For Roof of Hospital Operating Room, 1968-10-02

 Item — Cabinet Multi-Drawer D, Drawer: 18, Folder: 1
Scope and Contents From the Collection:

The Homestake Mining Company Maps and Blueprints Collection contains a wide variety of maps, drawings, blueprints, and other documents relating to the company's operation. Blueprints consist of machines the Homestake Mining Company used and the buildings that they built. This collection also contains various geological, metallurgical, and engineering maps of the mine.

Dates: 1968-10-02

D-18-083 -- Laminated Tudor Arch HMCo Guide Office, 1968-11-16

 Item — Cabinet Multi-Drawer D, Drawer: 18, Folder: 1

D-18-084 -- Three-Section Counter Guide Office, 1969-04-14

 Item — Cabinet Multi-Drawer D, Drawer: 18, Folder: 1
Scope and Contents From the Collection:

The Homestake Mining Company Maps and Blueprints Collection contains a wide variety of maps, drawings, blueprints, and other documents relating to the company's operation. Blueprints consist of machines the Homestake Mining Company used and the buildings that they built. This collection also contains various geological, metallurgical, and engineering maps of the mine.

Dates: 1969-04-14

D-18-094 -- Load Bulkhead for Trailer No. 7 at Spearfish Sawmill (for Creede Hauls), 1977-01-20

 Item — Cabinet Multi-Drawer D, Drawer: 18, Folder: 1
Scope and Contents From the Collection:

The Homestake Mining Company Maps and Blueprints Collection contains a wide variety of maps, drawings, blueprints, and other documents relating to the company's operation. Blueprints consist of machines the Homestake Mining Company used and the buildings that they built. This collection also contains various geological, metallurgical, and engineering maps of the mine.

Dates: 1977-01-20

D-18-098 -- Englewood Chlorinator Valve Mounting Bracket, 1973-10-05

 Item — Cabinet Multi-Drawer D, Drawer: 18, Folder: 1
Scope and Contents From the Collection:

The Homestake Mining Company Maps and Blueprints Collection contains a wide variety of maps, drawings, blueprints, and other documents relating to the company's operation. Blueprints consist of machines the Homestake Mining Company used and the buildings that they built. This collection also contains various geological, metallurgical, and engineering maps of the mine.

Dates: 1973-10-05

D-19-015 -- Map Showing Water Service Connections at Kirk Power Plant, 1936-03-25

 Item — Box 4, Folder: 3
Scope and Contents

Drawn by: H.J.S.

Scale: 1" = 20'

Drawing features a key with symbols for values, tees turned up, water mains, and drain pipes. The Drawing features the Chicago, Burlington and Quincy railroad, a Valve House, Whitetail Creek, and a Boiler room. Pipes are shown groing from the boiler room, across Whitetail Creek, to the value house, along side the railroad to the Old Abe Siphons.

Dates: 1936-03-25

D-19-021 -- Plan Relocation of 22 In. Gauge Track at East End Machine Shop, 1938-11-07, 1939-03-14

 Item — Box 4, Folder: 3
Scope and Contents

Drawn by: HJS

Scale: 1" = 10'

Drawing features a plan for the relocation of 22 inch guage track at the east end of the Machine Shop. Also featured on the drawing is a section labeled as Wash Rack.

Dates: 1938-11-07; Modified: 1939-03-14