Surface Shafts, Crushing Plants and Tramway
Subject
Subject Source: Local sources
Found in 4632 Collections and/or Records:
E-100-2 -- Ross Shaft-Dust Collector, Steel Details-"Ross" Feeder Chute, 1951-12-18
Item — Cabinet 2, Drawer: 17, Folder: Ross 4
Scope and Contents
Sheet #27
Dates:
1951-12-18
E-100-2 -- Ross Shaft-Dust Collector, Steel Details-"Ross" Feeder Platform, 1951-01-05
Item — Cabinet 2, Drawer: 17, Folder: Ross 4
Scope and Contents
Sheet #28
Dates:
1951-01-05
E-100-2 -- Ross Shaft-Dust Collector, Steel Details-"Ross" Feeder Platform, 1951-12-28
Item — Cabinet 2, Drawer: 17, Folder: Ross 4
Scope and Contents
Sheet #29
Dates:
1951-12-28
E-100-2 -- Ross Shaft-Dust Collector, Steel Details-"Ross" Feeder Platform, 1951-12-26
Item — Cabinet 2, Drawer: 17, Folder: Ross 4
Scope and Contents
Sheet #30
Dates:
1951-12-26
E-100-2 -- Ross Shaft-Dust Collector, Steel Details-Screen Chutes & Hopper, 1952-02-11
Item — Cabinet 2, Drawer: 17, Folder: Ross 4
Scope and Contents
Sheet #34
Dates:
1952-02-11
E-100-2 -- Ross Shaft-Dust Collector, Steel Details-Stairs Crusher Floor to Simons Base, 1952-03-31
Item — Cabinet 2, Drawer: 17, Folder: Ross 4
Scope and Contents
Sheet #38
Dates:
1952-03-31
E-100-2 -- Ross Shaft-Dust Collector, Steel Details-Stairways to No.5 Head Pulley Platform, 1952-04-10
Item — Cabinet 2, Drawer: 17, Folder: Ross 4
Scope and Contents
Sheet #41
Dates:
1952-04-10
E-100-2 -- Ross Shaft-Dust Collector, Steel Details-Transfer Hopper Belt No.4-Belt No.5, 1952-02-21
Item — Cabinet 2, Drawer: 17, Folder: Ross 4
Scope and Contents
Sheet #37
Dates:
1952-02-21
E-100-5 -- Ross Shaft-Crusher Alterations, 3-Stage Crushing at South Mill 15 Degree Belt Slope, 1949-08-11
Item — Cabinet 2, Drawer: 17, Folder: Ross 4
Scope and Contents
Sheet No. 4
Dates:
1949-08-11
E-100-5 -- Ross Shaft-Crusher Alterations, 3-Stage Crushing Layout, 1948-11-05
Item — Cabinet 2, Drawer: 17, Folder: Ross 4
Scope and Contents
Sheet No. 5
Dates:
1948-11-05