D-19-038 -- Standard Door Frame for 12 Inch Brick Wall, 1946-04-02

 Item — Box 4, Folder: 3
Scope and Contents

Drawn by: H.J.S.

Scale: 1-1/2" = 1'-0"

Blueprint for the standard door frame for a 12 inch brick wall, features drawings of the side jamb, head, jamb, and spreader bar. The drawing also includes a table of required materials.

Dates: 1946-04-02

D-19-039 -- Standard Window Lintel for Concrete Wall, 1946-04-02

 Item — Box 1
Scope and Contents

Drawn by: H.J.S.

Scale: 1-1/2" = 1'-0"

Blueprint of a standard windo lintel for concrete wall. Drawing features a front view and a side view.

Dates: 1946-04-02

D-19-040 -- Trolley Beam for Cyanide No. 3 , 1946-06-12

 Item — Box 4, Folder: 3
Scope and Contents

Drawn by: H.J.S.

Traced by: H.J.S.

Scale: None

Blueprint of Trolley Beam for Cyanide Plant No. 3. Also features a list of materials required.

Dates: 1946-06-12

D-19-041 -- Repair Collars for Hydro-Electric No. 2 Pipe Line, 1946-06-15

 Item — Box 4, Folder: 3
Scope and Contents

Drawn by: G.N.M.

Traced by: G.N.M.

Scale 3/4" = 1'-0"

Blueprint for repair collars fro teh Hydro-electric No. 2 pipe line. Drawings include the end view - large end, elevation, and end view - small end. Also on the drawing is a note about "repaid collar for connecting 60" redwood stave pipe to 50"k redwood stave pipe."

Dates: 1946-06-15

D-19-043 -- Ellison Heating Plant Ash Disposal Flume, 1946-09-26

 Item — Box 4, Folder: 3
Scope and Contents

Drawn by: G.N.M.

Traced by: G.N.M.

Scale: None

Blueprint for the Ellison Heating Plant Ash Disposal Flum. Drawing shows the boiler foundation, Section "A-", and the typical cross section of Ash Flume.

Dates: 1946-09-26

D-19-045 -- Access Stairway Ash Handling Crane Kirk Power Station, 1946-10-21

 Item — Box 4, Folder: 3
Scope and Contents

Drawn by: H.J.S.

Traced: H.J.S.

Scale: None

Blueprint for the Access Stairway for the Ash Handling Crane at teh Kirk Power Station. The sheet features drawings of the plan, side views, and view "A-A".

Dates: 1946-10-21

D-19-046 -- Sheet 1 -- Reno Pipe Bridge -- Steel Erection, 1947-07-05

 Item — Box 4, Folder: 3
Scope and Contents

Drawn by: L.G.W.

Traced by: L.G.W.

Approved by: G.N.M.

Scale: 3/4" = 12"

Bluerprint for the Reno Pipe Bridge, steel erection. Sheet features drawings of the plan, side elevation, and end elevation.

Dates: 1947-07-05

D-19-046 -- Sheet 2 -- Reno Pipe Bridge -- Steel, 1947-07-07, 1947-07-10

 Item — Box 4, Folder: 3
Scope and Contents

Drawn by: L.G.W.

Traced by: L.G.W.

Approved by: G.N.M.

Scale = 1" and 3" = 23"

Blueprint of the Renop Pipe Bridge, Steel. The sheet features drawings of Bridge stringers, and bridge beams. On July 10, 1947, L.G.W. made changes in the beams. There is also a not of "account No. 62411."

Dates: 1947-07-07; Modified: 1947-07-10

D-19-047 -- Engineering Department -- Supply Cabinet -- Drafting Room, 1947-09-17

 Item — Box 4, Folder: 3
Scope and Contents

Drawn by: L.G.W.

Traced by: L.G.W.

Scale: 1-1/2" = 12"

Blueprint of a supply cabinent in the drafting room for the Engineering Department. Sheet features drawing of the plan of top, side elevation, front, elevation, and isometric (shown without the doors). The drawing also notes "Charge #7142."

Dates: 1947-09-17

D-19-049 -- Turnout Sump Cover Main Spearfish Pipe Line, 1947-09-24

 Item — Box 4, Folder: 3
Scope and Contents

Drawn by: L.G.W.

Traced by: L.G.W.

Approved by: G.N.M.

Scale: 3/4" = 1"

Blueprint of turnour sump cover for the main Spearfish Pipeline. Sheet features drawings of the plan of sump cover, and section elevation. Also noted on the drawing is "Charge #62413" and written in pencil "this cover did not fit see DWg D-19-49A."

Dates: 1947-09-24