Spearfish (S.D.)
Found in 8 Collections and/or Records:
A-31-021-2 -- Spearfish Sawmill Group "BB", 1958-03-14
Drawn By: R.H.R.
Scale: 1" = 50'
Linen. Spearfish Sawmill Group "BB" Sheet 2 of 6 sheets. Has Homestake Coordinates. Shows Timber Yard, Lumber Yard, and wire fence.
A-31-021-5 -- Spearfish Sawmill Group "BB", 1958-03-18
Drawn By: R.H.R.
Scale: 1" = 50'
Linen. Spearfish Sawmill Group "BB" Sheet 5 of 6 Sheets. Has Homestake Coordinates. Shows Highway, sawmill buildings, and wire fence.
A-31-021-6 -- Spearfish Sawmill Group "BB", 1958-03-18
Drawn By: R.H.R.
Scale: 1" = 50'
Linen. Spearfish Sawmill Group "BB" Sheet 6 of 6 Sheets. Has Homestake Coordinates. Shows Highway, wire fence, and log storage area.
D-19-034 -- Toilet Partitions for Spearfish Sawmill, 1944-09-20
Drawn by: G.N.M.
Scale: None
Blueprint for the toilet partititons for the Spearfish Sawmill. Features drawings of the plan view, front elevation - view "A-A", and side elevations - views "B-B".
D-19-049 -- Turnout Sump Cover Main Spearfish Pipe Line, 1947-09-24
Drawn by: L.G.W.
Traced by: L.G.W.
Approved by: G.N.M.
Scale: 3/4" = 1"
Blueprint of turnour sump cover for the main Spearfish Pipeline. Sheet features drawings of the plan of sump cover, and section elevation. Also noted on the drawing is "Charge #62413" and written in pencil "this cover did not fit see DWg D-19-49A."
D-19-049A -- Turnout Sump Cover Main Spearfish Pipe Line, 1947-10-18
Drawn by: L.G.W.
Traced by: L.G.W.
Scale: None
Blueprint for the turnout sump cover for the main Spearfish pipe line. Drawing features the plan drawing for the turnour sump over. Also noted on the drawing is "Charge # 62412."