Skip to main content

Contours (Cartography)

 Subject
Subject Source: Library of Congress Subject Headings

Found in 22 Collections and/or Records:

A-34-003 -- Plan & Section from Old Foundry to Old Abe #2 Shaft

 Item — Cabinet Multi-Drawer A, Drawer: 34, Folder: 1
Scope and Contents

Scale: 1" = 20'

Tracing paper original in pencil. Plan Map and Section from Old Foundry to Old Abe #2 Shaft. Plan Map has Contours at 5'. Has Homestake Coordinates. Shows Old Foundry Building, Old Abe #2 Shaft Building, old Warehouse, Old Abe Street, Spring Street, and tunnel (Elevation=5190')

Dates: 1877 - 2007

D-19-044 -- Contour Map Area Above South Mill, 1946-09-30

 Item — Box 4, Folder: 3
Scope and Contents

Traced by: H.J.S.

Scale: 1" = 50'

Drawing features outlines of the South Mill, Refinery, Tank House, Lime Building, Warehouse, Bin, Inclining Hoist, Sub. Station, tanks, and part of Park Avenue in Lead, South Dakota. The countor lines are marked in brown.

Dates: 1946-09-30

D-19-095-1 -- Contour Map -- Yates Mine Office and Yates Dry, 1983-05-06, 1983-05-12

 Item — Box 4, Folder: 3
Scope and Contents

Drawn by: C.N.H.

Scale: 1" = 10'

Contour Map of the Yates Mine Office and Yates Dry. The sheet show Yates Dry, Yares Mine Office, Lawn, Shop Road, and a concrete sidewalk. There is a legend on the sheet and estimated quantities of materials. There is also a note on the sheet that states "Proposed road widening near Yates Dry - DM May 12 '83."

Dates: 1983-05-06; Modified: 1983-05-12

D-19-095-2 -- Contour Map - Yates Mine Office and Yates Dry, 1983-05-06

 Item — Box 4, Folder: 3
Scope and Contents

Drawn by: C.N.H.

Scale: 1" = 10'

Contour Map of the Yates Mine Office and Yates Dry. The sheet show Yates Dry, Yares Mine Office, Lawn, Shop Road, and a concrete sidewalk.

Dates: 1983-05-06

D-27-058-1 -- Grandview Retaining Wall Map of Existing May 83, 1983-05-06

 Item — Cabinet Multi-Drawer D, Drawer: 27, Folder: 1
Scope and Contents

Drawn By: D.M.

Scale: 1" = 20'

Tracing Paper, Grandview Apartments retaining Wall as existing May 1983. Plan map showing apartments, Grandview Avenue, and buildings down-hill. Also, contains 5 foot contours and Homestake Coordinate lines.

Dates: 1983-05-06

D-27-058-3 -- Grandview Wall Replacement Project, 1983-05-06

 Item — Cabinet Multi-Drawer D, Drawer: 27, Folder: 1
Scope and Contents

Drawn By: D.M.

Scale: 1" = 20'

Sepia Copy of D-27-058-1, Grandview Wall Replacement Project, Revised wall alignment with multiple cross-sections of new wall plus altered plan view. Original map is visible, that show the apartments, Grandview Ave., 5 foot contours and Homestake grid lines.

Dates: 1983-05-06

D-063-4 -- Contours on Proposed Pipe Line for Spearfish No. 2 Hydro Electric Plant, 1917-02-27

 Item — Box Cabinet D, Tub 2
Scope and Contents

Surveyed By: R.E.R.

F.A.C.

Scale: 1" = 100 feet

Shows contour lines from the Diversion Dam to the New end of the Tunnel. Drawing also shows the Chicago, Burlington, and Quincy (Spearfish branch) railraod, Maurice, Spearfish Creek, and Squaw Creek.

Dates: 1917-02-27

MT5-009 -- Geologic Map of Northern Black Hills, Southern Half of Lead Quadrangle, 1966-09

 Item — Box Misc. Tub 7
Scope and Contents

Drawn by: W.M., S.N.

Scale: 1" = 1000 feet

The map portion of this is missing. What is available is the index and title of the Geochemical Survey.

Plate 4A

Dates: 1966-09

MT5-009 -- Map 2 Geologic Map of Grizzly Gulch and Vicinity

 Item — Box Misc. Tub 7
Scope and Contents

Scale: 1" = 1000'

Countour Interval: 40'

Drawing includes a key of "Explanations" of tertiary, cambrain, and precambrian eras.

Dates: 1877 - 2007