Skip to main content

Cyanide process

 Subject
Subject Source: Library of Congress Subject Headings

Found in 2 Collections and/or Records:

D-19-017 -- Inside Diameters Tank No. 17 Cyanide No. 1, 1938-02-12

 Item — Box 1
Scope and Contents

Drawn by: HJS

Drawing featured the inside diameter for Tank No. 17 in Cyanide Plant No. 1. The drawing also shows a section through tank stave.

Dates: 1938-02-12

D-19-037A -- Cyanide No. 3 Extension of Bowl Classifier Floor Edge Materrial for Stair Well, 1946-03-20

 Item — Box 4, Folder: 3
Scope and Contents

Drawn by: L.G.W.

Traced by: L.G.W.

Scale: None

Blueprint for Cyanide Plant No. 3 Extension of Bowl Classifier Floor, Edge MAterial for Stair Welll. Drawing included is the plan, typical section, and elevation.

Dates: 1946-03-20