D-19-017 -- Inside Diameters Tank No. 17 Cyanide No. 1, 1938-02-12
Item — Box 1
Scope and Contents
Drawn by: HJS
Drawing featured the inside diameter for Tank No. 17 in Cyanide Plant No. 1. The drawing also shows a section through tank stave.
Dates:
1938-02-12
D-19-037A -- Cyanide No. 3 Extension of Bowl Classifier Floor Edge Materrial for Stair Well, 1946-03-20
Item — Box 4, Folder: 3
Scope and Contents
Drawn by: L.G.W.
Traced by: L.G.W.
Scale: None
Blueprint for Cyanide Plant No. 3 Extension of Bowl Classifier Floor, Edge MAterial for Stair Welll. Drawing included is the plan, typical section, and elevation.
Dates:
1946-03-20