Skip to main content

Ross Hoist Building (Lead, S.D.)

 Subject
Subject Source: Local sources

Found in 6 Collections and/or Records:

A-31-016-1 -- Homestake Mining Co. Ross Shaft Group "W"

 Item — Cabinet New 1, Drawer: 1, Folder: 1
Scope and Contents Scale: 1" = 50"Linen original. Homestake Mining Company, Lead, S.D. Building Group "W". Showing buildings labell with the group letter and a building number. Shows Ross Shaft building, Hoist building, compressor Plant, shop buildings, Kirk Road, CB&Q Railroad (Chicago, Burlington & Quicny) tracks, water lines, and water hydrants. Has Homestake Coordinates.These are the identified buildings: W1 - Headframe Building W2 - Crusher Building W3 - Conveyor...
Dates: 1877 - 2007

A-31-016 -- Homestake Mining Co., Lead, S.D., Ross Shaft Group "W", 1957-11-02

 Item — Cabinet New 1, Drawer: 1, Folder: 1
Scope and Contents Drawn By: R.H.R.Scale: 1" = 50'2 Copies, one linen original and one sepia plastic copy. Homestake Mining Company, Lead, South Dakota, Ross Shaft Building Group "W". Showing Homestake buildings labelled with group letter and building number. Showing Ross Hoist building, Ross Shaft Building, Compressor Plant, CB&Q Railroad (Chicago, Burlington & Quincy) track, Houston Street, Rosebud Avenue, Kirk Road, water lines, and water hydrants. Has Homestake...
Dates: 1957-11-02

A-33-034B -- Contours West of Ross Hoist Building Showing Location of Ross Shaft Compressor Plant and Cooling Tower, 1936-05-18

 Item — Cabinet New 1, Drawer: 1, Folder: 3
Scope and Contents

Drawn By: H.J. Sliper

Scale: 1" = 50'

Blackline paper copy. Contours west of Ross Hoist Building showing location of Ross Shaft Compressor Plant and Cooling Tower. 5' contours. Has Homestake Coordinates. Shows Hoist Building, Kirk Road, South Lead Cemetery Fence, and several unlabelled buildings.

Dates: 1936-05-18

A-34-021 -- Hearst Tunnel Syphon - Sewer Grade from Ross Hoist Building

 Item — Cabinet New 1, Drawer: 1, Folder: 4
Scope and Contents

Scale: Vertical=1"=10' Horizontal=1"=20'

Ledger (Graph) paper original. Hearst Tunnel Syphon. Sewer Grade from Ross Hoist Building to start of Tunnel.

Dates: 1877 - 2007

D-19-079 -- Ross and Yates Hoist Bldgs. Work Platforms Additions, 1958-09-12

 Item — Box 4, Folder: 3
Scope and Contents

Drawn by: Warren

Traced by: L.G.W.

Scale: 1-1/2"

Blueprint for the work platforms additions for the Ross and Yates Hoist Buildings. The sheet features drawings of bracket for extention of cage hoist rope opening work platform and angles to widden existing work platforms.

Dates: 1958-09-12

D-25-064 -- Ross Shaft and Hoist Building Parking, 1975

 Item — Cabinet New 1, Drawer: 1, Folder: 5
Scope and Contents

Scale: 1" = 10'

Tracing Paper. Ross Shaft and Hoist Building Parking. Homestake coordinates. Has change of slope markings and approximate parking spaces.

Dates: 1975