A-33-005 -- Total Length of Tunnel ???? Ft, Timbered Part 100 Ft.

 Item — Cabinet New 1, Drawer: 1, Folder: 3
Scope and Contents

Scale: 1" = 1'-0"

Heavy paper and drawn with pencil. Tunnel layout with 12" iron pipe on floor and Posts and box around the pipe. Total length of tunnel originally said 1159 feet but was erased. The first 100 feet of the tunnel will be timbered. There is a tunnel cross-section and a longitudinal section. There are several views of the box around the pipe. No mention of location.

Dates: 1877 - 2007

A-33-074 -- Ross, Yates and South Mill Ground Showing Ore Tramways, 1948-10-07

 Item — Cabinet New 1, Drawer: 1, Folder: 3
Scope and Contents

Drawn By: H.J.S.

Scale: 1" = 100'

Tracing Paper original. Ross Shaft, Yates Shaft, and South Mill Group showing ore tramways. Shows 2 tunnel sections, tunnels, and snow sheds. Has Homestake coordinates.

Dates: 1948-10-07

A-33-078 -- Savage Tunnel Timber Yard, 1952-06-03

 Item — Cabinet New 1, Drawer: 1, Folder: 3
Scope and Contents

Drawn By: L.W.M.

Scale: 1" = 20'

Linen original. Shows Area around the Savage Tunnel, Ross Tunnel, and Cap House along the Kirk Road. Has 5' contours near the Savage Tunnel.

Dates: 1952-06-03

F-056-1 -- Tungsten Mine, underground geology survey, 1920-05

 Item — Box Cabinet F, Basket 2
Scope and Contents Drawn By: E.G.R.Scale = 1" = 50'Map Labelled Tugsten Mine. This is map of the Cambrian gold and tungsten mine workings on the west side of the Homestake Open Cut. It also shows the City Crusher (Also known as the National Guard Crusher), the Draingae Tunnel which is below the mine workings, 2 unlabelled shafts, an office building, and a raise that goes from the mine workings to the Drainage Tunnel. The mine workings are in two different colors showing workings at...