A-31-002 -- Homestake Mining Company, Lead, S.D., Lead Group "B", 1958-01-10

 Item — Cabinet Multi-Drawer A, Drawer: 31, Folder: 1
Scope and Contents Drawn By: R.H.R.Scale: 1" = 50'1 Linen original, 1 sepia plastic copy and 1 blackline paper copy, Homestake Lead, SD, Building Group "B" with Building Numbers Letters and Location. Shwing East Main Street, Washington Street, Old Abe Street, Open Cut, Fox Street, Grandview Drive, Spring Street, and White Street. Also shows water lines.Includes the following buildings: B16 - Electrical Department Warehouse B17 - Truck Garage B18 - Electrical Department...
Dates: 1958-01-10

A-31-025 -- Map Showing Pipe Lines in Ellison, Yates, South Mill and Cyanide Area, 1970-05

 Item — Cabinet Multi-Drawer A, Drawer: 31, Folder: 2
Scope and Contents

Drawn By: Howard Mason

Scale: None

Linen. Map showing pipelines in Ellison Shaft Area, Homestake Shopyards, Yates Shaft Area, and the Cyanide Mill areas. Shows Lead Streets.

Dates: 1970-05

A-33-072 -- Map of Break in Hydro #2 Wood Stave Pipe Line, 1974-07-28

 Item — Cabinet Multi-Drawer A, Drawer: 33, Folder: 1
Scope and Contents

Drawn By: H.J.S.

Scale: 1" = 20'

Linen original. Map of break in Hydro-Electric No. 2 52" Wood stave pipeline. Approximately 1/2 mile below American Siding. Coordinates are labelled as assumed. Has 5' contours. Shows where pipeline enters South Portal of Long Tunnel. Has plan and profile view.

Dates: 1974-07-28

A3022-99-126 -- Sewer and Drain Lines Yates Hoist Basement, 1939-03-04

 Item — Cabinet New 1, Drawer: 1, Folder: 7
Scope and Contents

Drawn By: R.G.F.

Scale: 3/16" = 1'-0"

Blue Line Copy Sewer and Drain Lines Yates Hoist Basement. Plan View

Dates: 1939-03-04

D-19-041 -- Repair Collars for Hydro-Electric No. 2 Pipe Line, 1946-06-15

 Item — Box 4, Folder: 3
Scope and Contents

Drawn by: G.N.M.

Traced by: G.N.M.

Scale 3/4" = 1'-0"

Blueprint for repair collars fro teh Hydro-electric No. 2 pipe line. Drawings include the end view - large end, elevation, and end view - small end. Also on the drawing is a note about "repaid collar for connecting 60" redwood stave pipe to 50"k redwood stave pipe."

Dates: 1946-06-15

D-19-049 -- Turnout Sump Cover Main Spearfish Pipe Line, 1947-09-24

 Item — Box 4, Folder: 3
Scope and Contents

Drawn by: L.G.W.

Traced by: L.G.W.

Approved by: G.N.M.

Scale: 3/4" = 1"

Blueprint of turnour sump cover for the main Spearfish Pipeline. Sheet features drawings of the plan of sump cover, and section elevation. Also noted on the drawing is "Charge #62413" and written in pencil "this cover did not fit see DWg D-19-49A."

Dates: 1947-09-24

D-19-049A -- Turnout Sump Cover Main Spearfish Pipe Line, 1947-10-18

 Item — Box 4, Folder: 3
Scope and Contents

Drawn by: L.G.W.

Traced by: L.G.W.

Scale: None

Blueprint for the turnout sump cover for the main Spearfish pipe line. Drawing features the plan drawing for the turnour sump over. Also noted on the drawing is "Charge # 62412."

Dates: 1947-10-18

D-25-059 -- Location and Ties to 10" Tile of Deadwood Ditch, 1965-06-09

 Item — Cabinet Multi-Drawer D, Drawer: 25, Folder: 1
Scope and Contents

Scale: 1" = 40'

Tracing Paper. Location and Ties to 10" Tile of Deadwood Ditch. Shows CB&Q (Chicago, Burlington & Quincy Railroad) track with location of pipe-line.

Dates: 1965-06-09

D-27-056 -- Yates Hoist Building Roof Drain Plan, 1981-06-18

 Item — Cabinet Multi-Drawer D, Drawer: 27, Folder: 1
Scope and Contents

Tracing Paper. Yates Hoist Building Roof Drain Plan. Plan View of building and profile of pipe.

Dates: 1981-06-18

D-27-057-A -- Yates Hoist Building Modification in Drains, 1981-06-22

 Item — Cabinet Multi-Drawer D, Drawer: 27, Folder: 1
Scope and Contents

Scale: As Shown (Multiple)

Tracing Paper. Yates Hoist Building Modification in Drains. Hoist building plan plus views of septic system.