Water-pipes

 Subject
Subject Source: Library of Congress Subject Headings

Found in 6 Collections and/or Records:

A-31-002 -- Homestake Mining Company, Lead, S.D., Lead Group "B", 1958-01-10

 Item — Cabinet Multi-Drawer A, Drawer: 31, Folder: 1
Scope and Contents Drawn By: R.H.R.Scale: 1" = 50'1 Linen original, 1 sepia plastic copy and 1 blackline paper copy, Homestake Lead, SD, Building Group "B" with Building Numbers Letters and Location. Shwing East Main Street, Washington Street, Old Abe Street, Open Cut, Fox Street, Grandview Drive, Spring Street, and White Street. Also shows water lines.Includes the following buildings: B16 - Electrical Department Warehouse B17 - Truck Garage B18 - Electrical Department...
Dates: 1958-01-10

A-33-072 -- Map of Break in Hydro #2 Wood Stave Pipe Line, 1974-07-28

 Item — Cabinet Multi-Drawer A, Drawer: 33, Folder: 1
Scope and Contents

Drawn By: H.J.S.

Scale: 1" = 20'

Linen original. Map of break in Hydro-Electric No. 2 52" Wood stave pipeline. Approximately 1/2 mile below American Siding. Coordinates are labelled as assumed. Has 5' contours. Shows where pipeline enters South Portal of Long Tunnel. Has plan and profile view.

Dates: 1974-07-28

D-19-049 -- Turnout Sump Cover Main Spearfish Pipe Line, 1947-09-24

 Item — Box 4, Folder: 3
Scope and Contents

Drawn by: L.G.W.

Traced by: L.G.W.

Approved by: G.N.M.

Scale: 3/4" = 1"

Blueprint of turnour sump cover for the main Spearfish Pipeline. Sheet features drawings of the plan of sump cover, and section elevation. Also noted on the drawing is "Charge #62413" and written in pencil "this cover did not fit see DWg D-19-49A."

Dates: 1947-09-24

D-19-049A -- Turnout Sump Cover Main Spearfish Pipe Line, 1947-10-18

 Item — Box 4, Folder: 3
Scope and Contents

Drawn by: L.G.W.

Traced by: L.G.W.

Scale: None

Blueprint for the turnout sump cover for the main Spearfish pipe line. Drawing features the plan drawing for the turnour sump over. Also noted on the drawing is "Charge # 62412."

Dates: 1947-10-18

D-25-059 -- Location and Ties to 10" Tile of Deadwood Ditch, 1965-06-09

 Item — Cabinet Multi-Drawer D, Drawer: 25, Folder: 1
Scope and Contents

Scale: 1" = 40'

Tracing Paper. Location and Ties to 10" Tile of Deadwood Ditch. Shows CB&Q (Chicago, Burlington & Quincy Railroad) track with location of pipe-line.

Dates: 1965-06-09

D-30-052 -- Map of new 4" cast iron water line laid in July, 1974 on Third St., 1974-07-22

 Item — Cabinet Multi-Drawer D, Drawer: 30, Folder: 1
Scope and Contents

Drawn By: C. N. Heinen

Scale: 1" = 20'

Tracing Paper Original. Map of New 4" cast iron watr line laid in July, 1974 on Third St, also Metes & Bounds of lots. Has lot numbers and owners names.

Dates: 1974-07-22