A-31-018 -- Homestake Mining Company, Lead, South Dakota, Kirk Group "Y", 1934-12-22

 Item — Cabinet: New 1, Drawer: 1, Folder: 1

Scope and Contents

Drawn By: A.L.C. & R.S.F.

Scale: 1" = 50'

Linen original. Homestake Mining Company, Lead, South Dakota, Kirk Power Plant, Homestake Building Group "Y".Map shows buildings labelled with the building group letter and with a building number. Shwoing Switch Room, Turbine Room, Boiler Room, 2 cooling towers, and other buildings. Also shows, Whitetail Creek, Whitewood Creek, Kirk Road, water lines, CB&Q Railroad (Chicago, Burlington & Quincy) tracks, and bridges.

These are the following identified buildings: Y1 - Kirk Power Plant/Switch Room/Turbine Room/Boiler Room Y2 - Cooling Tower No. 1 Y2 - Cooling Tower No. 2 Y4 - Coal Bin Y5 - Outside Sub-Station Y6 - Garages Y7 - Oil Storage

Dates

  • 1934-12-22

Conditions Governing Access

This collection is housed at the Homestake Adams Research and Cultural Center with no restrictions to access. The collection may be utilized during normal operating hours or by appointment.

Extent

From the Collection: Unknown Linear Feet (37 Cabinets, 14 Baskets, 14 Tubs, 2 Boxes, and 7 Canisters)

Language of Materials

From the Collection: English